2

Remote Project Scheduler Jobs in Chicago, IL (NOW HIRING)

Project Manager

Chicago, IL · Remote

$40K - $45K/yr

As a Project Manager, you will work full-time in a remote capacity, overseeing and coordinating various projects to ensure successful delivery within scope, budget, and timeline. If you are a detail ...

Assistant Project Manager

Chicago, IL · On-site +1

$70K - $90K/yr

Schedule and manage deliveries of materials and equipment. Maintain accurate receiving records and ... remote/hybrid work options Paid parental leave Team lunches, events, and stocked kitchens Modern ...

Senior Project Manager

Chicago, IL · Remote

$100K - $137K/yr

Experience with contract negotiation, cost control, and scheduling tools (e.g., MS Project, Primavera, or similar) is a plus Working Conditions: * This is a remote position with expected travel

Assistant Project Manager

Chicago, IL · On-site +1

$70K - $90K/yr

Schedule and manage deliveries of materials and equipment. Maintain accurate receiving records and ... Flexible remote/hybrid work options · Paid parental leave · Team lunches, events, and stocked ...

Lead Project Manager

Chicago, IL · Remote

$55 - $65/hr

Lead Program Manager, Remote (CST/EST hours). Start date is To be confirmed for this 6 Month ... Monitor project milestones and critical dates, identify schedule risks, develop action plans to ...

Project Management Analyst

Chicago, IL · On-site +1

$55K - $75K/yr

... scheduling, documentation, permitting, and overall project coordination - helping ensure every ... remote/hybrid work options Paid parental leave Team lunches, events, and stocked kitchens Modern ...

Project Management Analyst

Chicago, IL · On-site +1

$55K - $75K/yr

... scheduling, documentation, permitting, and overall project coordination -- helping ensure every ... Flexible remote/hybrid work options · Paid parental leave · Team lunches, events, and stocked ...

This is a Globally remote role. The role entails * Ensuring programs and projects are delivered within the schedule, scope, cost, budget and resources expectations * Identifying key technical and ...

*****Illinois resident only-Remote ***** * Proficient to Expert skill in the following: o MS Excel o MS ... Controlling and monitoring program and project activities * Good knowledge and handling of project ...

Showing results 41-60

Remote Project Scheduler information

See Chicago, IL salary details

$39.7K

$119.3K

$148.5K

How much do remote project scheduler jobs pay per year?

As of Sep 3, 2026, the average yearly pay for remote project scheduler in Chicago, IL is $119,293.00, according to ZipRecruiter salary data. Most workers in this role earn between $100,500.00 and $147,400.00 per year, depending on experience, location, and employer.

What does a remote project scheduler do?

As a remote project scheduler, you focus on time management and schedule coordination for a project or a company’s operations. Someone in this work from home position is often responsible for creating an effective plan for the completion of each project, so your responsibilities often include finding ways to coordinate the time of project team members and contractors in a way that minimizes costs. A remote project scheduler uses software to organize the schedule and budgetary information, and your duties often include maintaining a record of completed work and the number of hours that employees or contractors work.

What does a remote project scheduler do?

A Remote Project Scheduler is responsible for creating, updating, and maintaining project schedules from a remote location. They work closely with project managers and team members to ensure tasks are properly scheduled and deadlines are met. Using various software tools, they track project progress, identify potential delays, and provide reports to stakeholders. Their goal is to keep projects on track, anticipate scheduling conflicts, and support successful project delivery.

What are the key skills and qualifications needed to thrive as a remote project scheduler, and why are they important?

To thrive as a Remote Project Scheduler, you need strong organizational skills, knowledge of project management methodologies, and experience with scheduling and resource allocation, often backed by a degree in business or a related field. Proficiency in project management software like Microsoft Project, Primavera P6, or Smartsheet, as well as familiarity with collaboration tools such as Slack or Teams, is typically required. Attention to detail, time management, and proactive communication are critical soft skills for coordinating remote teams and handling shifting priorities. These skills and qualities are vital to ensure project timelines are met, resources are optimized, and remote teams remain aligned and productive.

How does a remote project scheduler typically coordinate with project teams across different time zones?

As a Remote Project Scheduler, you’ll often work with teams and stakeholders located in various regions, which can pose challenges in real-time communication and scheduling. To manage this, you’ll use collaborative project management tools and shared calendars to align schedules, set clear deadlines, and ensure transparency. Regular virtual meetings, asynchronous updates, and proactive follow-ups are crucial for keeping everyone informed and on track. Flexibility and strong organizational skills are essential to adjust plans as needed and accommodate diverse working hours.

What is the difference between Remote Project Scheduler vs Remote Project Coordinator?

AspectRemote Project SchedulerRemote Project Coordinator
CertificationsPMI Scheduling Professional, PMP (preferred)CAPM, PMP (optional)
Primary ResponsibilitiesDeveloping and maintaining project schedules, resource allocationAssisting with project tasks, communication, and documentation
Work EnvironmentTypically in project management teams within industries like construction, IT, engineeringSupports project teams across various industries, often in administrative roles

Remote Project Schedulers focus on creating detailed project timelines and managing schedules, requiring specific scheduling certifications. Remote Project Coordinators handle broader project support tasks, often with less emphasis on scheduling certifications. Both roles are vital in project management but differ in scope and responsibilities.

What are the most commonly searched types of Project Scheduler jobs in Chicago, IL?

The most popular types of Project Scheduler jobs in Chicago, IL are:

What are popular job titles related to Remote Project Scheduler jobs in Chicago, IL?

For Remote Project Scheduler jobs in Chicago, IL, the most frequently searched job titles are:

What cities near Chicago, IL are hiring for Remote Project Scheduler jobs?

Cities near Chicago, IL with the most Remote Project Scheduler job openings:

Infographic showing various Remote Project Scheduler job openings in Chicago, IL as of August 2026, with employment types broken down into 88% Full Time, 8% Part Time, and 4% Contract. Highlights an 85% Physical, 4% Hybrid, and 11% Remote job distribution, with an average salary of $119,293 per year, or $57.4 per hour.

Protection & Controls Substation Project Manager

Amped I LLC

Chicago, IL • On-site, Remote

$125K - $155K/yr

Full-time

Medical, Dental, Vision, Life, Retirement, PTO

Re-posted yesterday


Key responsibilities

  • Manage teams of engineers, designers, and drafters as they design and modify high voltage protection and control systems for utilities.

  • Direct and lead projects from the bid or pre-proposal stage through construction to project completion, managing the full project lifecycle.

  • Prepare project Scope of Work, create and maintain project schedules and budgets, and communicate project progress and issues to stakeholders.


Job description

Description

Amped I LLC was founded in 2010 as a design and engineering firm specializing in power infrastructure projects ranging from transmission to distribution for power utility, industry, government and commercial facilities. Amped I is a small, certified Women's Business Enterprise with the goal to provide exceptional value, integrity, and client satisfaction to all of our clients' needs. Amped I is also committed to both career growth and job satisfaction for each individual team member. We are proud and stand behind our core values of accountability, collaboration, positive energy, problem solving, and continuous improvement.


Job Summary

The Project Manager role is a mid-senior level, full-time, permanent position. This position is fully-remote, allowing you to work from home Monday - Friday each week. This role supports a portfolio of engineering projects across multiple clients and is responsible for ensuring the successful execution of each project on time, on scope, and on budget, while adhering to internal and external quality standards. Project Managers work with a team of engineers, designers, and drafters. If you're looking for an exciting opportunity where your contributions and career growth is valued from day one, we invite you to apply!


Duties/Responsibilities

Responsibilities include but are not limited to the following:

  • Manage teams of engineers, designers and drafters as they design and modify new or existing high voltage protection and control systems for utilities.
  • Direct and lead a team from the bid or "pre-proposal" stage through construction to the completion of the project as-builts, managing the full lifecycle of all projects.
  • Prepare project Scope of Work (SOW) documentation, create and maintain project schedules using Gantt chart tools such as Microsoft Project, develop and track project budgets at an individual level and at a portfolio level, and ensure that every expectation for the project timeline and budget is met to internal and external stakeholders' satisfaction.
  • Communicate with Business Development, client representatives, and internal leadership regarding project progress, deadlines, changes, and roadblocks to ensure proactive project management.
  • Work closely with Client Success (Operations) to align project schedules with resource needs.
  • Manage and oversee matrixed reporting teams to drive project progress in collaboration with team supervisors and internal leadership.
  • Work with each project team to order necessary materials and complete needed procurement support for engineering projects.
  • Report out project financials and project health metrics to the Operations Manager teams weekly to identify issues and discuss mitigation strategies.
  • Provide leadership, guidance, mentorship and instruction to project teams and staff members. 
  • Support Contract creation, adherence, and negotiation with internal and external stakeholders.
  • Leads discussions on project expectations to ensure project leads (engineers) understand the project flow, schedule and budget needs to meet end goals.

Supervisory Responsibilities

  • Directly supervises a total of 2-3 employees directly and a department of up to 25 indirectly. Responsible for the overall direction, coordination, and evaluation of these units
  • Responsible for the overall direction, coordination, and evaluation of these team members 
  • Carries out supervisory responsibilities in accordance with the Company's policies and applicable laws 
  • Other responsibilities include interviewing, hiring, and training employees; planning, assigning, and directing work; appraising performance; rewarding and disciplining employees; addressing complaints and resolving problems

Requirements

Required Skills and Abilities

  • Strong organizational skills and systems, along with the ability to understand, modify, and create project workflows to ensure team success
  • Excellent written and verbal communication skills in English
  • Advanced knowledge of and experience with of Microsoft applications, including MS Word, Excel, PowerPoint, and Project
  • Intermediate to Advanced knowledge of project finance and project controls principles and best practices
  • Domestic travel up to 25%, including but not limited to quarterly visits to Amped I HQ for planning discussions

Education and Experience

  • Bachelor's degree in Electrical Engineering from a 4-year ABET-accredited university required
  • Project Management Certification or other documented PM training course preferred
  • Project management experience with the design, procurement, and construction of Power Transmission and Distribution assets, specifically within substations required 
  • Protection & Controls engineering design experience is strongly preferred to ensure a solid technical understanding of projects and workflows
  • Professional Engineer (PE) License strongly preferred, but not required
  • 2+ years experience as a Project Manager for relay protection and control design of high voltage 12-500 kV substation projects required

Compensation and Benefits

We offer a competitive salary along with a comprehensive benefits package, including:

  • Health Insurance: Medical, dental, and vision plans, as well as access to telemedicine.
  • Retirement Plans: 401(k) with a company match.
  • Paid Time Off (PTO): Vacation days, sick leave, and personal time off.
  • Paid Company Holidays: Company paid holidays and one floating holiday.
  • Family Support: Paid leave policies for maternity, paternity, adoption, and foster care placement.
  • Life and Disability Insurance: Basic and supplemental life insurance, short- and long-term disability insurance.
  • Flexible Scheduling: Remote work options and flexible work hours.

**In order to be considered for this position, please also complete the Culture Index assessment, linked here.


Our company embraces diversity and equal opportunity in a serious way. We are committed to building a team that represents a variety of backgrounds, perspectives, and skills. We believe the more inclusive we are, the better our work will be.