Develop, maintain, and manage detailed project schedules using Primavera P6 for large-scale low-voltage projects, including electronic security, fire alarm, and life safety systems. * Collaborate ...
Develop, maintain, and manage detailed project schedules using Primavera P6 for large-scale low-voltage projects, including electronic security, fire alarm, and life safety systems. * Collaborate ...
High proficiency in the latest versions of Primavera P6 and the MS Office Suite. * A degree in Construction Management, Engineering, or Architecture (or 8 years of experience). * A "detective's" eye ...
Quick apply
High proficiency in the latest versions of Primavera P6 and the MS Office Suite. * A degree in Construction Management, Engineering, or Architecture (or 8 years of experience). * A "detective's" eye ...
Oracle Primavera Architect
$120K - $140K/yr
Support end-to-end migration of project portfolio data from Oracle Primavera P6/EPPM and Primavera Data Warehouse environments to Oracle Primavera Cloud * Analyze legacy Primavera databases, data ...
Oracle Primavera Architect
$120K - $140K/yr
Support end-to-end migration of project portfolio data from Oracle Primavera P6/EPPM and Primavera Data Warehouse environments to Oracle Primavera Cloud * Analyze legacy Primavera databases, data ...
High proficiency in the latest versions of Primavera P6 and the MS Office Suite. * A degree in Construction Management, Engineering, or Architecture (or 8 years of experience). * A "detective's" eye ...
High proficiency in the latest versions of Primavera P6 and the MS Office Suite. * A degree in Construction Management, Engineering, or Architecture (or 8 years of experience). * A "detective's" eye ...
Be Seen First
Project Scheduler - P6/Primavera - MUST BE LOCAL
Waddell, AZ · On-site
$50 - $80/hr
Seeking an experienced Primavera P6 Project Scheduler for a contract project opportunity in Waddell. 3+ Months Contract opportunity Onsite Data Center/Mission Critical Construction Projects Track ...
Quick apply
Be Seen First
Project Scheduler - P6/Primavera - MUST BE LOCAL
Waddell, AZ · On-site
$50 - $80/hr
Seeking an experienced Primavera P6 Project Scheduler for a contract project opportunity in Waddell. 3+ Months Contract opportunity Onsite Data Center/Mission Critical Construction Projects Track ...
Scheduling Specialist (Primavera P6)
New York, NY · On-site
$95K - $115K/yr
Must have experience with various PC-based scheduling tools (Primavera P6, MS Project, Open Plan). * Experience with other software should include EXCEL, WORD, and PowerPoint. * Requires logical ...
Scheduling Specialist (Primavera P6)
New York, NY · On-site
$95K - $115K/yr
Must have experience with various PC-based scheduling tools (Primavera P6, MS Project, Open Plan). * Experience with other software should include EXCEL, WORD, and PowerPoint. * Requires logical ...
P6 Scheduler
Salt Lake City, UT · On-site
$100 - $150/hr
Update and maintain project schedules in Primavera P6. * Review existing schedules and identify opportunities for improvement. * Incorporate project progress, changes, and updated timelines. * Work ...
P6 Scheduler
Salt Lake City, UT · On-site
$100 - $150/hr
Update and maintain project schedules in Primavera P6. * Review existing schedules and identify opportunities for improvement. * Incorporate project progress, changes, and updated timelines. * Work ...
P6 Scheduler Data Center
Columbus, OH · On-site
Develop, maintain, and manage detailed project schedules in Primavera P6 . * Establish and update baseline, current, and recovery schedules. * Monitor project progress, milestones, critical path ...
Quick apply
P6 Scheduler Data Center
Columbus, OH · On-site
Develop, maintain, and manage detailed project schedules in Primavera P6 . * Establish and update baseline, current, and recovery schedules. * Monitor project progress, milestones, critical path ...
VRK IT Vision Inc. is seeking a Primavera & Unifier SME to provide implementation and support experience. The role involves functional and technical knowledge in Primavera and Unifier configurations ...
VRK IT Vision Inc. is seeking a Primavera & Unifier SME to provide implementation and support experience. The role involves functional and technical knowledge in Primavera and Unifier configurations ...
P6 Scheduler - Data Centers
Monroe, LA · On-site
Essential Skills * 3+ years of hands-on experience with Primavera P6, including building, updating, and analyzing complex project schedules. * Proven scheduling experience within data center projects ...
Quick apply
P6 Scheduler - Data Centers
Monroe, LA · On-site
Essential Skills * 3+ years of hands-on experience with Primavera P6, including building, updating, and analyzing complex project schedules. * Proven scheduling experience within data center projects ...
P6 Scheduler - Data Centers
Monroe, LA · On-site
$60 - $68/hr
Essential Skills * 3+ years of hands-on experience with Primavera P6, including building, updating, and analyzing complex project schedules. * Proven scheduling experience within data center projects ...
P6 Scheduler - Data Centers
Monroe, LA · On-site
$60 - $68/hr
Essential Skills * 3+ years of hands-on experience with Primavera P6, including building, updating, and analyzing complex project schedules. * Proven scheduling experience within data center projects ...
P6 Business Systems Analyst
Boston, MA · On-site
Responsibilities Primavera P6 and SmartPM Administration * Administer, configure, maintain, and support Primavera P6 EPPM and Professional, SmartPM and related scheduling environments. * Maintain ...
P6 Business Systems Analyst
Boston, MA · On-site
Responsibilities Primavera P6 and SmartPM Administration * Administer, configure, maintain, and support Primavera P6 EPPM and Professional, SmartPM and related scheduling environments. * Maintain ...
Scheduling Specialist (Primavera P6)
Boston, MA · On-site
$95K - $115K/yr
Must have experience with various PC-based scheduling tools (Primavera P6, MS Project, Open Plan). * Experience with other software should include EXCEL, WORD, and PowerPoint. * Requires logical ...
Scheduling Specialist (Primavera P6)
Boston, MA · On-site
$95K - $115K/yr
Must have experience with various PC-based scheduling tools (Primavera P6, MS Project, Open Plan). * Experience with other software should include EXCEL, WORD, and PowerPoint. * Requires logical ...
P6 Business Systems Analyst
Boston, MA · On-site
Responsibilities Primavera P6 and SmartPM Administration * Administer, configure, maintain, and support Primavera P6 EPPM and Professional, SmartPM and related scheduling environments. * Maintain ...
P6 Business Systems Analyst
Boston, MA · On-site
Responsibilities Primavera P6 and SmartPM Administration * Administer, configure, maintain, and support Primavera P6 EPPM and Professional, SmartPM and related scheduling environments. * Maintain ...
Oracle P6 Primavera
Rosemead, CA · On-site
Oracle P6 Primavera TestingXperts is a Specialist QA & Software Testing Company, and an Independent Software Testing division of Damco Group, which is a leading IT Solutions and Services company ...
Oracle P6 Primavera
Rosemead, CA · On-site
Oracle P6 Primavera TestingXperts is a Specialist QA & Software Testing Company, and an Independent Software Testing division of Damco Group, which is a leading IT Solutions and Services company ...
P6 Scheduler
Oklaunion, TX · On-site
About the Role Triad Control Systems is seeking an experienced Primavera P6 Scheduler to join our Plant Services team for an onsite assignment supporting construction in the successful delivery of ...
New
P6 Scheduler
Oklaunion, TX · On-site
About the Role Triad Control Systems is seeking an experienced Primavera P6 Scheduler to join our Plant Services team for an onsite assignment supporting construction in the successful delivery of ...
New
Develop and maintain detailed schedules using Primavera P6 and Microsoft Project * Monitor project progress, analyze trends, and identify critical-path bottlenecks * Identify risks, communicate them ...
Quick apply
Develop and maintain detailed schedules using Primavera P6 and Microsoft Project * Monitor project progress, analyze trends, and identify critical-path bottlenecks * Identify risks, communicate them ...
Oracle P6 Primavera
Rosemead, CA · On-site
Oracle P6 Primavera Location: Rosemead , CA Duration: 6+ Months * As consultant you will be responsible for implementation of Oracle P6 Primavera. * You will be responsible to understand project ...
Oracle P6 Primavera
Rosemead, CA · On-site
Oracle P6 Primavera Location: Rosemead , CA Duration: 6+ Months * As consultant you will be responsible for implementation of Oracle P6 Primavera. * You will be responsible to understand project ...
P6 Scheduler
Grand Prairie, TX · On-site
Develop, maintain, and manage detailed project schedules using Primavera P6. * Integrate cost, resources, and schedule data to support project planning and controls. * Collaborate with project ...
P6 Scheduler
Grand Prairie, TX · On-site
Develop, maintain, and manage detailed project schedules using Primavera P6. * Integrate cost, resources, and schedule data to support project planning and controls. * Collaborate with project ...
Experience in Oracle Primavera P6 project management tools, Udesigner * Experience working with multiple teams across geographical locations. * Should have strong analytical skills, should be team ...
Experience in Oracle Primavera P6 project management tools, Udesigner * Experience working with multiple teams across geographical locations. * Should have strong analytical skills, should be team ...
Primavera P6 information
See salary details
$25.96 - $31.14
3% of jobs
$31.14 - $36.32
4% of jobs
$36.32 - $41.50
5% of jobs
$46.35 is the 25th percentile. Wages below this are outliers.
$41.50 - $46.68
13% of jobs
$46.68 - $51.86
12% of jobs
The median wage is $54.56 / hr.
$51.86 - $57.04
24% of jobs
$61.16 is the 75th percentile. Wages above this are outliers.
$57.04 - $62.22
17% of jobs
$62.22 - $67.40
12% of jobs
$67.40 - $72.57
5% of jobs
$72.57 - $77.75
2% of jobs
$77.75 - $82.93
2% of jobs
$25
$55
$82
How much do primavera p6 jobs pay per hour?
What is a Primavera P6?
A Primavera P6 job typically involves project planning, scheduling, and management using Oracle Primavera P6 software. Professionals in this role create and maintain project schedules, allocate resources, track progress, and ensure timely project completion. Industries like construction, engineering, manufacturing, and IT use Primavera P6 for complex project management. Skills in critical path method (CPM) scheduling, resource optimization, and risk analysis are often required.
What are the typical responsibilities of someone working in a Primavera P6 role?
Professionals working with Primavera P6 are primarily responsible for developing, updating, and maintaining detailed project schedules, often for large-scale construction or engineering projects. They collaborate closely with project managers, engineers, and other stakeholders to gather activity data, sequence tasks, and monitor project progress against key milestones. The role frequently requires analyzing schedule delays, preparing reports, and recommending actions to keep projects on track. This position offers the opportunity to work in fast-paced environments where strong analytical skills and teamwork are essential to drive project success.
What are the key skills and qualifications needed to thrive in the Primavera P6 position, and why are they important?
To thrive in a Primavera P6 role, you need strong project scheduling, planning, and management skills, typically supported by a relevant degree in engineering, construction management, or a related field. Proficiency in Oracle Primavera P6 software, and familiarity with industry standards (such as PMI or AACE certifications), are highly valued. Attention to detail, effective communication, and strong organizational abilities are key soft skills for success. These competencies are essential to create accurate project schedules, coordinate teams, and ensure projects are delivered on time and within budget.
What jobs use Primavera P6?
What cities are hiring for Primavera P6 jobs?
Cities with the most Primavera P6 job openings:
What are the most commonly searched types of Primavera P6 jobs?
The most popular types of Primavera P6 jobs are:
What states have the most Primavera P6 jobs?
States with the most job openings for Primavera P6 jobs include:
What job categories do people searching Primavera P6 jobs look for?
The top searched job categories for Primavera P6 jobs are:

Convergint rating
7.7
Based on 95 frontline employees who took The Breakroom Quiz
176th of 500 rated business services
Job description
For information about how we use your personal information, please see our Colleague & Applicant Privacy Notice, available on convergint.com/careers.
Who You Are
You have a passion for providing world-class service to customers, colleagues and communities. You are a person of integrity with a commitment to growth, accountability and delivering results. You want to join an organization with a positive culture that embraces equal opportunity and allows everyone to be the best version of themselves at work and home. You want to grow with us and deliver results as an exceptional Project Scheduler.
Who We Are
With 20-years of proven growth and exceptional performance, our mission is to be our customer's best service provider. We realize the importance of diversity in achieving that goal. Our company was built upon a solid foundation of 10 Values and Beliefs which drive our unmatched culture, making us the #1 global, serviced-based systems integrator in the industry. We take great pride in protecting the lives and assets of our customers and their communities with the solutions we provide.
What You'll Do
Convergint's greatest strength is our people! Every colleague is encouraged to participate in our Recruit Awesome People program, helping us grow Convergint by promoting our colleague-first culture and referring top talent to the Talent Acquisition Team and hiring managers.
- Develop, maintain, and manage detailed project schedules using Primavera P6 for large-scale low-voltage projects, including electronic security, fire alarm, and life safety systems.
- Collaborate with Project Managers, Operations, Field Leaders, and subcontractors to create baseline schedules that align with project scope, milestones, contractual obligations, and resource availability.
- Perform Critical Path Method (CPM) scheduling analysis and proactively identify schedule risks, delays, and resource conflicts.
- Update and maintain project schedules based on field progress, scope changes, procurement status, manpower availability, and customer requirements.
- Integrate labor forecasts, material lead times, subcontractor activities, and site readiness into project schedules to ensure accurate execution planning.
- Analyze schedule impacts related to delays, change orders, labor constraints, or material shortages and provide recovery recommendations.
- Generate and distribute schedule updates, look-ahead schedules, variance reports, and progress reports to internal and external stakeholders.
- Support operations leadership with workforce planning and forecasting for active and upcoming project demands.
- Coordinate with Procurement, Engineering, and Field Operations teams to validate project readiness and maintain schedule accuracy.
- Participate in project kickoff meetings, OAC meetings, and weekly operational reviews to communicate scheduling updates and constraints.
- Ensure all schedules align with contract requirements, customer expectations, and General Contractor milestone deadlines.
- Coordinate scheduling activities across multiple trades and vendors supporting large-scale low-voltage infrastructure deployments.
- Maintain detailed documentation of schedule revisions, delays, impacts, and schedule-related communications.
- Act as "our customer's best service provider" by delivering accurate scheduling information and proactively communicating schedule changes.
- Perform other duties and responsibilities as requested or required.
What You'll Need
- Advanced proficiency with Primavera P6 scheduling software required.
- Strong understanding of construction scheduling methodologies, including Critical Path Method (CPM) scheduling.
- Experience building, maintaining, and analyzing complex project schedules within large-scale low-voltage, security, fire alarm, or life safety projects.
- Understanding of installation sequencing, procurement coordination, and field execution for electronic security and fire alarm systems.
- Ability to interpret construction drawings, project specifications, and sequencing requirements.
- Strong organizational and analytical skills with the ability to manage multiple projects and competing priorities simultaneously.
- Excellent communication and coordination skills across operations, field teams, subcontractors, General Contractors, and customers.
- Ability to identify scheduling conflicts and develop practical recovery plans to minimize project impacts.
- Experience tracking labor productivity, procurement activities, and project milestones.
- Strong attention to detail and ability to maintain accurate project documentation and reporting.
- Proactive, solution-oriented mindset with the ability to adapt in a fast-paced project environment.
- Experience with Microsoft Office Suite, including Excel and reporting tools.
- Data center, mission critical, or large-scale construction project experience preferred.
Requirements
Education:
College degree, trade school, or equivalent work experience.
Required Experience
- 3-5+ years of experience using Primavera P6 in a construction scheduling or project controls role.
- Demonstrated experience with CPM scheduling, schedule analysis, and schedule recovery planning.
- Experience coordinating schedules with General Contractors, subcontractors, field operations, and procurement teams.
Preferred Experience
- Data center or mission-critical project experience.
- Experience supporting large-scale low-voltage projects, including electronic security, fire alarm, and life safety systems.
- Knowledge of project controls, forecasting, resource loading, and labor planning methodologies.
- Familiarity with construction project lifecycle management and field operations coordination.
Convergint is an Equal Opportunity Employer.
Visit our Convergint careers site to learn more about the company and the exciting opportunities available.
Equal Opportunity Employer/Protected Veterans/Individuals with Disabilities
This employer is required to notify all applicants of their rights pursuant to federal employment laws. For further information, please review the Know Your Rights notice from the Department of Labor.
What Convergint employees say
Pay
Benefits
Hours and flexibility
Workplace
Get the full story on Breakroom
About Convergint
Sourced by ZipRecruiter
Industry
Investigation and physical security services
Company size
10,000+ Employees
Headquarters location
Schaumburg, IL, US
Year founded
2001