2

Entry Level Project Scheduler Jobs in Spring, TX

... entry-level Field Engineer or Technician who is eager to build hands-on technical experience and ... Weekend travel may be available up to two times per month, subject to project schedule requirements ...

... entry-level Field Engineer or Technician who is eager to build hands-on technical experience and ... Weekend travel may be available up to two times per month, subject to project schedule requirements ...

Senior Drafter

Houston, TX · On-site

$60K - $85K/yr

However, a certificate in drafting will be required for entry-level positions. The schedule for ... projects and develop your technical and professional skills. Opportunity to visit construction ...

... designs and help move projects from concept to construction. What to expect: * Entry-level ... Alternative Work Schedules Headhunters and recruitment agencies may not submit resumes through this ...

Ability to maintain regular attendance as per work schedule agreed with the manager (may require working an adjusted work schedule based on project assigned and work overtime if warranted). * Ability ...

Be Seen First

Architectural Intern

Houston, TX · On-site

$60K - $72K/yr

Project Coordinator - Architecture (Entry Level) MFA Program Management · Macon, Georgia · ... Help schedule and prepare for project meetings, record minutes, and track action items through to ...

Relocation assistance

next page

Showing results 1-20

Entry Level Project Scheduler information

See Spring, TX salary details

$34.3K

$103K

$128.1K

How much do entry level project scheduler jobs pay per year?

As of Jul 14, 2026, the average yearly pay for entry level project scheduler in Spring, TX is $102,970.00, according to ZipRecruiter salary data. Most workers in this role earn between $86,800.00 and $127,300.00 per year, depending on experience, location, and employer.

What jobs pay 4000 a week without a degree?

Entry level project scheduler roles typically do not pay $4,000 a week without experience or specialized certifications. High-paying jobs that can reach this level without a degree often include skilled trades such as commercial truck driving, certain sales positions, or technical roles like real estate agents, which rely on skills and licensing rather than formal education. These roles may require on-the-job training, licensing, or certifications but not necessarily a college degree.

What are the key skills and qualifications needed to thrive in the Entry Level Project Scheduler position, and why are they important?

To thrive as an Entry Level Project Scheduler, you should have strong organizational skills, attention to detail, basic project management knowledge, and at least an associate degree or equivalent experience. Familiarity with scheduling software such as MS Project or Primavera P6, and proficiency in Microsoft Excel, are often expected. Effective communication, teamwork, and a proactive approach to handling shifting priorities help candidates stand out. These skills and qualities are crucial for ensuring project timelines are maintained and team coordination is effective throughout a project's lifecycle.

What are some typical daily tasks for an Entry Level Project Scheduler?

As an Entry Level Project Scheduler, your daily responsibilities often include updating project timelines, tracking task progress, and communicating with team members to gather updates or address scheduling conflicts. You may also assist with preparing reports for project managers and help identify potential risks or delays in the schedule. Collaboration with different departments, such as engineering or procurement, is common to ensure all project activities are aligned. This role provides a great opportunity to learn about project management processes and work closely with experienced professionals in a structured, supportive environment.

Are project schedulers in demand?

Project schedulers are in demand across various industries such as construction, engineering, and IT, especially as organizations seek to improve project efficiency and meet deadlines. Strong skills in scheduling software like Primavera P6 or Microsoft Project and relevant certifications can enhance job prospects in this field.

How to become a project scheduler with no experience?

To become an entry-level project scheduler, gaining knowledge of project management principles and tools like Microsoft Project or Primavera is essential. Earning certifications such as the Certified Associate in Project Management (CAPM) can improve job prospects, and starting in related roles like administrative support or assistant positions can provide relevant experience.

What is an Entry Level Project Scheduler job?

An Entry Level Project Scheduler is responsible for assisting in the planning, coordination, and monitoring of project schedules to ensure timely completion. They work under the supervision of senior schedulers or project managers, using scheduling software like Microsoft Project or Primavera P6 to track tasks, deadlines, and resource allocation. Their role often involves updating schedules, identifying potential delays, and communicating changes to stakeholders. This position is ideal for individuals looking to build a career in project management or scheduling.

How do you get a PM job with no experience?

Entry-level project scheduler roles often require some familiarity with project management principles and tools like MS Project or Primavera. Gaining relevant certifications such as CAPM or PMP, even at an entry level, and demonstrating strong organizational and communication skills can improve chances of securing a project management position without prior experience.
What are popular job titles related to Entry Level Project Scheduler jobs in Spring, TX? For Entry Level Project Scheduler jobs in Spring, TX, the most frequently searched job titles are:
What job categories do people searching Entry Level Project Scheduler jobs in Spring, TX look for? The top searched job categories for Entry Level Project Scheduler jobs in Spring, TX are:
What cities near Spring, TX are hiring for Entry Level Project Scheduler jobs? Cities near Spring, TX with the most Entry Level Project Scheduler job openings:
Infographic showing various Entry Level Project Scheduler job openings in Spring, TX as of July 2026, with employment types broken down into 1% Locum Tenens, 83% Full Time, 15% Part Time, and 1% Contract. Highlights an 95% Physical, 1% Hybrid, and 4% Remote job distribution, with an average salary of $102,970 per year, or $49.5 per hour.
Associate Field Engineer

Associate Field Engineer

Wunderlich-Malec

Houston, TX • On-site

Full-time

Medical, Dental, Vision, Life, Retirement, PTO

Posted 4 days ago


Job description

Wunderlich-Malec Engineering (WM) is a 100% employee-owned ESOP and one of the largest and most well-established engineering companies in the United States. When you join WM you become part of a company that is:

  • 100% employee-owned with 40+ years of industry history
  • ENR (Engineering News Record) Top 500 firm
  • Rated as a top System Integrator Giant

Wunderlich-Malec Engineering (WM) is a 100% employee-owned ESOP and one of the largest and most well-established engineering companies in the United States. When you join WM you become part of a company that is:

  • 100% employee-owned with 40+ years of industry history
  • ENR (Engineering News Record) Top 500 firm
  • Rated as a top System Integrator Giant

Our Houston, TX Wunderlich Malec Engineering team is seeking a travel-ready, entry-level Field Engineer or Technician who is eager to build hands-on technical experience and grow quickly. Field-based commissioning work provides direct exposure to systems, customers, schedules, and real-time decision-making, accelerating the development of technical expertise and project execution skills. Compared with a traditional office-based engineering role, this position provides direct ownership of installation verification, control system testing, commissioning support, and start-up activities. This role supports projects across industries including Data Center, Semiconductor, Life Science, Food & Beverage, and other industrial facilities. Responsibilities include electrical and controls engineering support, electrical and instrumentation verification, coordination with clients and electrical subcontractors, PLC/SCADA/HMI support, commissioning execution, and start-up assistance.

Major Responsibilities

  • Installation & Wiring QA/QC Verification (Level 2 Commissioning). Verify that control panels, field devices, instruments, and related control system equipment have been installed and wired in accordance with manufacturer requirements, approved shop drawings, project documentation, and applicable quality standards and specifications
  • Point-to-Point Testing (Level 3 Commissioning). Confirm that field devices associated with the control system are installed, wired, addressed, and configured in accordance with approved system drawings and documentation. This includes verification of data to and from field devices, including signals received through network integration
  • Functional Performance Testing (FPT) (Level 4 Commissioning). Verify that the control system and field devices operate as defined by the project design documentation. This includes testing control sequences, alarm and alert configuration, alarm activation, trend displays, trend configuration, system graphics, and control system response during failure scenarios
  • System-Level Testing Support (Level 5 Commissioning). Support system-level testing to confirm that the control system and field devices operate together as an integrated system. This includes verifying control sequences across related systems, using the facility’s Supervisory Control and Data Acquisition (SCADA) system to view equipment status and navigate system screens, activating alarms, monitoring trends, and supporting failure-mode testing

Minimum Requirements

Education BS Electrical, Computer, Chemical, or Mechanical Engineering preferred. An AA in Engineering Technology or equivalent field technician experience may be substituted.

Experience New Graduate or 0-2 years of field experience

  • Understanding of or exposure to field instrumentation, hardware panels and low voltage controls design
  • Understanding of control systems, components, PLC programming, SCADA programming and their applications

Physical Demands of Position

Requirements Above all else, attention to all applicable safety specifications and standards is a requirement. Strong attention to detail and a consistent focus on quality control are required, especially during repetitive commissioning activities. The role may include writing, computer work, field work in construction trailers or industrial environments, color perception, hearing, verbal and written communication, teamwork, manual dexterity, driving, lifting, climbing, mounting and dismounting equipment, pushing, and pulling. Regular interaction and coordination with customers, subcontractors, vendors, and internal project teams is expected. Daily use of a computer, standard office applications, and a mobile phone is required.

Working/Residence Plan

Up to 100% travel to project sites may be required, excluding approved vacation or paid time off.

Work is typically performed Monday through Friday, with occasional weekend work required based on project needs.

Assignments may last multiple months at various U.S.-based project sites. Weekend travel may be available up to two times per month, subject to project schedule requirements and approval. Project housing, airfare, meals, and incidentals are covered by the company in accordance with company policy.

This position includes full company benefits, structured training, mentorship, and three weeks of paid time off.

Work Conditions This is primarily a field-based, hands-on role performing automation work at client sites, with occasional office or trailer-based work as needed.

Field/Client Site Environment (Primary)

  • Ability to stand, move, and work on job sites for up to 8-12 hour shifts
  • Ability to climb stairs/ladders, work at heights, and occasionally lift up to 40 lbs
  • Frequent bending, reaching, and working in and around industrial equipment
  • Exposure to construction, industrial, and processing environments, including noise, temperature changes, and moving machinery
  • Ability to safely wear required PPE (safety glasses, steel-toed boots, hearing protection, and electrical safety gear as applicable)
  • Comfortable performing electrical/instrumentation checkout and troubleshooting (e.g., voltage testing, control panel wiring)

Office/Trailer Work (Occasional)

  • Periods of sitting/standing at a computer, including in on-site construction trailers
  • Standard office/PC and cell phone use for documentation, communication, and project support

Ability to work safely and effectively in both indoor and outdoor environments, including exposure to extreme temperatures, weather conditions, humidity, dust, and other environmental conditions typical of construction, industrial, and processing facilities.

Reasonable accommodation can be provided for individuals with disabilities to perform essential job functions.

Career Growth & Advancement This role is designed for ambitious, goal-oriented self-starters who want to accelerate their technical and leadership development through hands-on field experience. Field Engineers and Technicians who demonstrate strong technical capability, sound judgment, ownership, and leadership on-site can advance faster than peers following a traditional office-based engineering path. High performers may move into lead field roles ahead of the typical timeline.

Training & Mentorship You'll build capability through hands-on training across progressively challenging commissioning assignments, Level 2 through Level 5, with mentorship from senior field engineers on every project.

Merit-Based Advancement Advancement is based on demonstrated proficiency, ownership, technical judgment, and field performance - not time in role alone. Commissioning Levels 2 through 5 represent scopes of commissioning activity, not job titles. As capability grows across these scopes, high performers can earn responsibility for larger and more complex commissioning activities.

Own It in the Field As you demonstrate competency, you're given real ownership on-site. This includes:

  • Leading point-to-point testing campaigns for entire system areas independently.
  • Owning functional performance testing for major systems end-to-end.
  • Serving as the primary technical point of contact with subcontractors and customers during system-level testing.
  • Directing and overseeing commissioning activities for a major project area — taking full accountability for safety, quality, schedule, and sign-off.

Where Can This Take You Field engineers and technicians who build a strong track record are positioned for rapid advancement, including paths such as:

  • Associate Field Engineer → Staff Field Engineer → Senior Field Engineer
  • QA/QC Manager
  • Controls Project Engineer
  • Commissioning Lead
  • Project Manager
  • Mentor or Technical Evaluator for future field hires

    *Job Descriptions are not exhaustive lists of all skills, responsibilities, or efforts associated with a job.  They reflect principal job elements essential for performing the job and evaluating performance.

    Wunderlich-Malec is proud to offer a comprehensive employee-owner benefit package. Full-time employees may be eligible for the following benefits: Medical • Dental • Vision • Basic and Supplemental Life and AD&D • Long Term Disability • Voluntary Short Term Disability • Healthcare & Dependent Care Flexible Spending Accounts • Health Savings Account • Paid Time Off (PTO) • Paid Holidays • Tuition Reimbursement • Referral Bonus Program • 401(k)/Profit Sharing • 100% ESOP (Employee Stock Ownership Plan) • Employee Assistance Program • Will Preparation Resources • Worldwide Travel Assistance

    #LI-WM1