2

Entry Level Project Scheduler Jobs in Tennessee (NOW HIRING)

... and scheduled circulation desk coverage. The ideal candidate will possess a strong attention to ... projects, including inventory, withdrawals, and record cleanup. Library Instruction * Provide ...

... and scheduled circulation desk coverage. The ideal candidate will possess a strong attention to ... projects, including inventory, withdrawals, and record cleanup. Library Instruction * Provide ...

Create & follow up on Project Delivery Kanban cards * Safety * Assist with scheduling site safety ... High school diploma or equivalent * Entry level experience in construction project management or ...

Create & follow up on Project Delivery Kanban cards * Safety * Assist with scheduling site safety ... High school diploma or equivalent * Entry level experience in construction project management or ...

... entry-level Associate Project Engineer for its Memphis-142 operations based in Memphis, TN. The ... Supporting the implementation of the job schedule * Coordinating warranties and O&M's * Material ...

Associate Project Engineer

Memphis, TN ยท On-site

$70K - $75K/yr

... entry-level Associate Project Engineer for its Memphis-142 operations based in Memphis, TN. The ... Supporting the implementation of the job schedule * Coordinating warranties and O&M's * Material ...

Showing results 21-40

Entry Level Project Scheduler information

See Tennessee salary details

$34.9K

$105K

$130.7K

How much do entry level project scheduler jobs pay per year?

As of Aug 7, 2026, the average yearly pay for entry level project scheduler in Tennessee is $105,021.00, according to ZipRecruiter salary data. Most workers in this role earn between $88,500.00 and $129,800.00 per year, depending on experience, location, and employer.

What are the key skills and qualifications needed to thrive as an entry level project scheduler?

To thrive as an Entry Level Project Scheduler, you should have strong organizational skills, attention to detail, basic project management knowledge, and at least an associate degree or equivalent experience. Familiarity with scheduling software such as MS Project or Primavera P6, and proficiency in Microsoft Excel, are often expected. Effective communication, teamwork, and a proactive approach to handling shifting priorities help candidates stand out. These skills and qualities are crucial for ensuring project timelines are maintained and team coordination is effective throughout a project's lifecycle.

What does an entry level project scheduler do?

As an Entry Level Project Scheduler, your daily responsibilities often include updating project timelines, tracking task progress, and communicating with team members to gather updates or address scheduling conflicts. You may also assist with preparing reports for project managers and help identify potential risks or delays in the schedule. Collaboration with different departments, such as engineering or procurement, is common to ensure all project activities are aligned. This role provides a great opportunity to learn about project management processes and work closely with experienced professionals in a structured, supportive environment.

What is an entry level project scheduler?

An Entry Level Project Scheduler is responsible for assisting in the planning, coordination, and monitoring of project schedules to ensure timely completion. They work under the supervision of senior schedulers or project managers, using scheduling software like Microsoft Project or Primavera P6 to track tasks, deadlines, and resource allocation. Their role often involves updating schedules, identifying potential delays, and communicating changes to stakeholders. This position is ideal for individuals looking to build a career in project management or scheduling.

How do you become an entry level project scheduler?

To become an entry-level project scheduler, candidates typically need a bachelor's degree in construction management, engineering, or a related field. Gaining skills in project management software like Primavera P6 or Microsoft Project and understanding scheduling principles are important, along with relevant internships or entry-level experience in project coordination.
What are popular job titles related to Entry Level Project Scheduler jobs in Tennessee? For Entry Level Project Scheduler jobs in Tennessee, the most frequently searched job titles are:
What job categories do people searching Entry Level Project Scheduler jobs in Tennessee look for? The top searched job categories for Entry Level Project Scheduler jobs in Tennessee are:
What cities in Tennessee are hiring for Entry Level Project Scheduler jobs? Cities in Tennessee with the most Entry Level Project Scheduler job openings:
Infographic showing various Entry Level Project Scheduler job openings in Tennessee as of August 2026, with employment types broken down into 86% Full Time, 10% Part Time, and 4% Contract. Highlights an 86% Physical, 5% Hybrid, and 9% Remote job distribution, with an average salary of $105,021 per year, or $50.5 per hour.

Power System Design Engineer - Entry Level

Pae

Tullahoma, TN โ€ข On-site

Full-time

Medical, Dental, Vision, Life, Retirement, PTO

Posted 22 days ago


Job description

Amentum Advanced Solutions (AS) is a performance unit of Amentum Engineering & Technology Line of Business. Advanced Solutions specializes in the development, design, construction, and operation of unique and complex research & development, scientific, and test facilities, including wind tunnels (aerospace, DoD, automotive, motorsports, etc.), rocket test stands, climatic chambers, jet engine test cells, acoustic chambers, altitude test facilities, captive trajectory systems, and nuclear facilities. AS projects span the automotive, motorsports, defense, nuclear, and aerospace markets. Recent clients include Audi, Boeing, BMW, Volkswagen, Fiat Chrysler, Ford, Honda, General Motors, NASA, U.S. Air Force, U.S. Navy, U.S. Department of Energy, and many others across North America, Europe, and Asia.


AS is looking for an Entry Level Power Systems Design Engineer supporting several projects in a dynamic and exciting environment. This position will provide you with an unparalleled opportunity to work with a team of motivated engineering and business professionals who work to ensure client satisfaction and deliver projects within scope, budget, and schedule.


Responsibilities include:

  • Developing drawings including one-line diagrams, elementary wiring diagrams, power system plans, lighting plans, and installation details.
  • Designing power distribution systems that include load flow analysis, short circuit analysis, arc flash analysis, system safety, human safety, and other advanced systems.
  • Developing power distribution protection schemes with coordination studies, transfer schemes, etc.
  • Perform load calculations for sizing electrical components, cables, conduit, and equipment spacing
  • Specify major electrical system components including substations, switchgear, distribution panels, MCCs, transformers, disconnects, and drives for low and medium voltage AC and DC systems.
  • Design lighting systems for test facilities including specification and analysis of illumination levels and lighting quality
  • Developing interfaces to facility equipment using hardwired interfaces and industrial networks.
  • Appling NEC, NESC, NFPA 70E, and other applicable codes in developing state-of-the-art solutions for the client.
  • Providing quality system processes such as checking the work of others, following standard procedures, and ensuring compliance to codes and standards.
  • Supporting hardware assembly and fabrication during factory and onsite installation.
  • Performing power system startup, checkout, and commissioning, both domestically and abroad.
  • Communicating with clients and management regarding project status.
  • Coordinating with other engineering disciplines and departments to ensure success.
  • Estimating system design, material, installation, checkout, commissioning, and activation of projects.
  • Planning labor resources and scheduling project milestones to ensure project completion within technical scope, budget, and client schedule.
  • Developing proposals to capture future work with current clients and new markets.
  • Leading power system projects through all phases to include design, fabrication, implementation, testing and commissioning.

Education/Experience/Training, and or Skill Requirements

  • A Bachelor of Science in Electrical Engineering from an ABET accredited engineering program.
  • 0-3 years of experience in power distribution system design, implementation, or commissioning.
  • Proficiency in all Microsoft Office programs.
  • Experience in software skills such as SKM, ETAP, SEL synchroWAVe, ArcPro is a plus.
  • An interest and background in electrical safety, electrical power distribution systems (including switchgear, substations, MCCs, PLCs, drive systems, protective relays, cable and wireway), lightning protection, grounding, lighting design, smart-grid systems, micro-grid systems, SCADA systems, and challenging projects.
  • A desire to develop ingenious alternative approaches to challenges, and drive innovation during all phases of projects.
  • A drive to participate on teams or alone to design, develop, and deliver power system projects.
  • An ability to lead single and multi-discipline engineering teams to generate future workloads, deliver on project promises, and encourage and mentor colleagues.
  • US Citizenship

Essential Functions

Unusual or Special Physical Requirements of Position

  • Lifting 50 lbs. (<5%)
  • Maneuver in and around facility equipment for field measurements or troubleshooting (<5%)
  • Proximity to electrical circuits up to 120VAC (<5%)
  • Proximity to electrical circuits up to 161kVAC (5%-15%)
  • Special clothing/equipment may include appropriate Personal Protective Equipment (PPE) including eye protection, hearing protection, arc flash protection, shock protection, etc. (5%-15%)

Description of Work Environment

  • Office, lab environment, or indoors on a construction site (>90%)
  • Field work outside (5%-15%)
  • Travel to customer sites for meetings, installation, commissioning, and troubleshooting (>10%)

Equipment and Machines Involved in Work Tasks

  • General office equipment (>80%)
  • Power Distribution devices such as Transformers, Switchgear, Motor Control Centers (MCCs), Human Machine Interfaces (HMIs), Variable Frequency Drives (VFDs), servo drives, industrial instrumentation, data acquisition measurement systems, etc. (>50%)
  • Multimeters (5%-15%)
  • Power Quality Meters (5%-15%)
  • Handheld electrical tools such as strippers, cutters, crimpers, terminators, etc. (5%-15%)

Criticality of Attendance

  • Regular attendance in office is mandatory
  • Work hours four 9-hour days and 4-hour Friday
  • Overtime to meet project schedules and milestones (10%-20%)
  • Field assignments that include 2nd or 3rd shift (5%-15%)
  • Field work attendance and punctuality is critical

Compensation Details:

$61,660 - $101,600

The compensation range or hourly rate listed for this position is provided as a good-faith estimate of what the company intends to offer for this role at the time this posting was issued. Actual compensation may vary based on factors such as job responsibilities, education, experience, skills, internal equity, market data, applicable collective bargaining agreements, and relevant laws.

Benefits Overview:

Our health and welfare benefits are designed to support you and your priorities. Offerings include:

  • Health, dental, and vision insurance

  • Paid time off and holidays

  • Retirement benefits (including 401(k) matching)

  • Educational reimbursement

  • Parental leave

  • Employee stock purchase plan

  • Tax-saving options

  • Disability and life insurance

  • Pet insurance

Note: Benefits may vary based on employment type, location, and applicable agreements. Positions governed by a Collective Bargaining Agreement (CBA), the McNamara-O'Hara Service Contract Act (SCA), or other employment contracts may include different provisions/benefits.

Original Posting:

07/16/2026 - Until Filled

Amentum anticipates this job requisition will remain open for at least three days, with a closing date no earlier than three days after the original posting. This timeline may change based on business needs.

Amentum is proud to be an Equal Opportunity Employer. Our hiring practices provide equal opportunity for employment without regard to race, sex, sexual orientation, pregnancy (including pregnancy, childbirth, breastfeeding, or medical conditions related to pregnancy, childbirth, or breastfeeding), age, ancestry, United States military or veteran status, color, religion, creed, marital or domestic partner status, medical condition, genetic information, national origin, citizenship status, low-income status, or mental or physical disability so long as the essential functions of the job can be performed with or without reasonable accommodation, or any other protected category under federal, state, or local law. Learn more about your rights under Federal laws and supplemental language atLabor Laws Posters.