Pile Superintendant
Mexia, TX ยท On-site
This role ensures piling activities are completed safely, on schedule, within budget, and in ... Supervise daily pile driving and foundation operations on-site * Plan, schedule, and coordinate ...
Quick apply
Mexia, TX ยท On-site
This role ensures piling activities are completed safely, on schedule, within budget, and in ... Supervise daily pile driving and foundation operations on-site * Plan, schedule, and coordinate ...
Quick apply
Mexia, TX ยท On-site
This role ensures piling activities are completed safely, on schedule, within budget, and in ... Supervise daily pile driving and foundation operations on-site * Plan, schedule, and coordinate ...
... piling. * Familiarity with corrosion protection strategies for aggressive marine environments. * Technical Skills: * Proficiency in AutoCAD, RISA-3D (or similar FEM software), and deep foundation ...
Quick apply
... piling. * Familiarity with corrosion protection strategies for aggressive marine environments. * Technical Skills: * Proficiency in AutoCAD, RISA-3D (or similar FEM software), and deep foundation ...
... piling. * Familiarity with corrosion protection strategies for aggressive marine environments. * Technical Skills: * Proficiency in AutoCAD, RISA-3D (or similar FEM software), and deep foundation ...
Quick apply
... piling. * Familiarity with corrosion protection strategies for aggressive marine environments. * Technical Skills: * Proficiency in AutoCAD, RISA-3D (or similar FEM software), and deep foundation ...
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
$96K - $130.40K/yr
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
$96K - $130.40K/yr
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Houston, TX ยท On-site
$96K - $130.40K/yr
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Houston, TX ยท On-site
$96K - $130.40K/yr
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Houston, TX ยท On-site
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Houston, TX ยท On-site
Review the work of engineers and designers developing engineering and design documents for Piling & Foundation and Module & Stick Built Steel Pipe Racks/Structures as needed for the project.
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Quick apply
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Quick apply
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan--sequencing, methodology, resource loading, and area turnover strategy
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan-sequencing, methodology, resource loading, and area turnover strategy
Piling, drilled shafts, and deep foundation systems as applicable * Develop and own the civil construction execution plan-sequencing, methodology, resource loading, and area turnover strategy
Fremont, CA ยท On-site
$76.60K - $103.40K/yr
Familiarity with the foundation and piling equipment industry. * Knowledge of quality management systems (e.g., ISO 9001) and lean principles. Nextpower offers a comprehensive benefits package. We ...
Fremont, CA ยท On-site
$76.60K - $103.40K/yr
Familiarity with the foundation and piling equipment industry. * Knowledge of quality management systems (e.g., ISO 9001) and lean principles. Nextpower offers a comprehensive benefits package. We ...
Earthwork, subgrade preparation, piling inspections (driven/drilled). * Basic understanding of soil ... Geotechnical analysis including bearing capacity evaluations, stability analysis and foundation ...
Earthwork, subgrade preparation, piling inspections (driven/drilled). * Basic understanding of soil ... Geotechnical analysis including bearing capacity evaluations, stability analysis and foundation ...
$76.60K - $103.40K/yr
Familiarity with the foundation and piling equipment industry. * Knowledge of quality management systems (e.g., ISO 9001) and lean principles. Nextpower offers a comprehensive benefits package. We ...
$76.60K - $103.40K/yr
Familiarity with the foundation and piling equipment industry. * Knowledge of quality management systems (e.g., ISO 9001) and lean principles. Nextpower offers a comprehensive benefits package. We ...
... piling, diaphragm walls, Kelly drilling, dynamic compaction and other forms of ground improvement. * Advise and recommend to sales staff and customers the appropriate foundation methods for ...
... piling, diaphragm walls, Kelly drilling, dynamic compaction and other forms of ground improvement. * Advise and recommend to sales staff and customers the appropriate foundation methods for ...
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
Earthwork, subgrade preparation, piling inspections (driven/drilled). * Basic understanding of soil ... Geotechnical analysis including bearing capacity evaluations, stability analysis and foundation ...
Earthwork, subgrade preparation, piling inspections (driven/drilled). * Basic understanding of soil ... Geotechnical analysis including bearing capacity evaluations, stability analysis and foundation ...
Rogers, MN ยท On-site
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
Rogers, MN ยท On-site
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
Rogers, MN ยท On-site
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
Rogers, MN ยท On-site
The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the ... At least two years' deep foundation/drilling experience preferred, but not required. * AWS Welding ...
Design of foundations, piling, concrete structures, and structural steel systems. * Review and ... Proficiency with structural analysis and design software (e.g., RISA, STAAD & Foundation software ...
Design of foundations, piling, concrete structures, and structural steel systems. * Review and ... Proficiency with structural analysis and design software (e.g., RISA, STAAD & Foundation software ...
$22K - $32.5K
12% of jobs
$41.4K is the 25th percentile. Wages below this are outliers.
$32.5K - $43K
16% of jobs
$43K - $53.5K
12% of jobs
The median wage is $62.7K / yr.
$53.5K - $64K
13% of jobs
$64K - $74.5K
13% of jobs
$84.3K is the 75th percentile. Wages above this are outliers.
$74.5K - $85K
12% of jobs
$85K - $95.5K
8% of jobs
$95.5K - $106K
5% of jobs
$106K - $116.5K
5% of jobs
$116.5K - $127K
4% of jobs
$127K - $137.5K
1% of jobs
$22K
$70.6K
$137.5K

Full-time
Posted 4 days ago
Here at Narrow Way Energy, we believe in making our world a better tomorrow. One that offers our children a self-sustainable energy source to power our future. We are constantly finding new ways to make the construction of these solar facilities more efficient and profitable for our clients.
Pile Superintendent Job Description
Position Summary
The Pile Superintendent is responsible for overseeing all pile installation operations on assigned projects. This role ensures piling activities are completed safely, on schedule, within budget, and in compliance with project specifications, engineering requirements, and applicable regulations. The Pile Superintendent leads field crews, coordinates equipment and materials, and works closely with project management, engineers, and inspectors.
Key Responsibilities
Qualifications
Preferred Skills
Physical Requirements
--Job Compensation:
Overtime is offered after 40 hours at a time and a half. Per diem Days worked if traveling to project.