2

Entry Level Project Scheduler Jobs in Portland, OR

Traveling Equipment Engineer

Vancouver, WA · On-site

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

  • PTO

Requisition ID: 179509 Job Level: Entry Level Home District/Group: Kiewit Equipment Services ... inventory, schedule crews, and manage quality and safety * Specialty projects as needed ...

Structural Engineer

Lake Oswego, OR · Hybrid

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

WSP is currently initiating a search for an Entry Level Structural Engineer for our Lake Oswego ... Ability to occasionally work schedules conducive to project-specific requirements that may extend ...

Structural Engineer

Lake Oswego, OR · On-site

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

WSP is currently initiating a search for an Entry Level Structural Engineer for our Lake Oswego ... Ability to occasionally work schedules conducive to project-specific requirements that may extend ...

... entry level designers. The incumbent has experience in the subject area and a working knowledge of ... of the project including models, plans, elevations, sections, schedules, and details to support ...

Field Engineer

Vancouver, WA · On-site

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

  • PTO

This position is an entry level position accountable for providing field engineering project ... Scheduling Project Tracking Software Cost Control Engineering & Project Standards and Safety ...

Senior Structural Drafter

Lake Oswego, OR

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

  • PTO

Engage in occasional contact with client and contractor personnel to schedule and coordinate project drafting and design support review. * Provide guidance and training to entry-level drafting and ...

Senior Structural Drafter

Lake Oswego, OR · On-site

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

  • PTO

Engage in occasional contact with client and contractor personnel to schedule and coordinate project drafting and design support review. * Provide guidance and training to entry-level drafting and ...

Paint Crew Leader

Portland, OR · On-site

$27 - $28/hr

You'll be responsible for keeping the project on schedule and within budget, maintaining clear ... Many of our painters begin as Entry-Level Painters and advance into leadership roles. We're proud ...

Showing results 41-60

Entry Level Project Scheduler information

See Portland, OR salary details

$40.8K

$122.7K

$152.7K

How much do entry level project scheduler jobs pay per year?

As of Aug 15, 2026, the average yearly pay for entry level project scheduler in Portland, OR is $122,712.00, according to ZipRecruiter salary data. Most workers in this role earn between $103,400.00 and $151,700.00 per year, depending on experience, location, and employer.

What are the key skills and qualifications needed to thrive as an entry level project scheduler?

To thrive as an Entry Level Project Scheduler, you should have strong organizational skills, attention to detail, basic project management knowledge, and at least an associate degree or equivalent experience. Familiarity with scheduling software such as MS Project or Primavera P6, and proficiency in Microsoft Excel, are often expected. Effective communication, teamwork, and a proactive approach to handling shifting priorities help candidates stand out. These skills and qualities are crucial for ensuring project timelines are maintained and team coordination is effective throughout a project's lifecycle.

What does an entry level project scheduler do?

As an Entry Level Project Scheduler, your daily responsibilities often include updating project timelines, tracking task progress, and communicating with team members to gather updates or address scheduling conflicts. You may also assist with preparing reports for project managers and help identify potential risks or delays in the schedule. Collaboration with different departments, such as engineering or procurement, is common to ensure all project activities are aligned. This role provides a great opportunity to learn about project management processes and work closely with experienced professionals in a structured, supportive environment.

What is an entry level project scheduler?

An Entry Level Project Scheduler is responsible for assisting in the planning, coordination, and monitoring of project schedules to ensure timely completion. They work under the supervision of senior schedulers or project managers, using scheduling software like Microsoft Project or Primavera P6 to track tasks, deadlines, and resource allocation. Their role often involves updating schedules, identifying potential delays, and communicating changes to stakeholders. This position is ideal for individuals looking to build a career in project management or scheduling.

How do you become an entry level project scheduler?

To become an entry-level project scheduler, candidates typically need a bachelor's degree in construction management, engineering, or a related field. Gaining skills in project management software like Primavera P6 or Microsoft Project and understanding scheduling principles are important, along with relevant internships or entry-level experience in project coordination.

What are the most commonly searched types of Project Scheduler jobs in Portland, OR?

The most popular types of Project Scheduler jobs in Portland, OR are:

What are popular job titles related to Entry Level Project Scheduler jobs in Portland, OR?

For Entry Level Project Scheduler jobs in Portland, OR, the most frequently searched job titles are:

What job categories do people searching Entry Level Project Scheduler jobs in Portland, OR look for?

The top searched job categories for Entry Level Project Scheduler jobs in Portland, OR are:

Infographic showing various Entry Level Project Scheduler job openings in Portland, OR as of August 2026, with employment types broken down into 86% Full Time, 10% Part Time, and 4% Contract. Highlights an 85% Physical, 5% Hybrid, and 10% Remote job distribution, with an average salary of $122,712 per year, or $59 per hour.

Equipment Engineer - Kiewit Equipment Services 2026

Kiewit

Vancouver, WA • On-site

Full-time

Medical, Dental, Vision, Life, Retirement, PTO

Re-posted 7 days ago


Kiewit Corporation rating

7.7

Company rating: 7.7 out of 10

Based on 137 frontline employees who took The Breakroom Quiz

24th of 80 rated construction


Job description

Requisition ID: 179193
Job Level: Entry Level
Home District/Group: Kiewit Equipment Services
Department: Equipment
Market: Transportation
Employment Type: Full Time
Position Overview
As an Entry Level Equipment Engineer, you will support Construction & Mining operations. This position is responsible for the planning, scheduling, budgeting, utilization and reliability of a construction and mining equipment fleet. The position will deal with day to day as well as long term issues related to an equipment fleet. The position's main focus will be to improve equipment reliability as well as implement, monitor, audit, and manage preventative maintenance programs.
District Overview
Kiewit Equipment Services (KES) helps to ensure the profitability of Kiewit projects through the improved equipment utilization and mechanical reliability by delivering world-class equipment and service.
Location
One of the many things that makes Kiewit's culture unique is that we go where the work is, which opens up your career to abundant opportunities. We relocate our teams based on the work that is available, combined with the development plans, skill sets, and career goals of each team member. This means your Kiewit adventure is custom-designed to meet our shared needs. Equipment Engineers could be based across the United States.
Responsibilities
  • Understand and comply with all federal, state, and company health, safety, and environmental requirements
  • Material handling and procurement
  • Create and maintain tool/filter lists and documentation
  • Inspections of equipment and parts
  • Logistics management and communication
  • Long/short range equipment planning, scheduling, and budgeting
  • Planning and paperwork processing to prepare for critical lifts
  • Use reliability and failure analysis data to increase equipment availability and reliability
  • Establish and maintain communications between all levels of supervision and management
  • Support of craft maintenance technicians - ordering parts, manage inventory, schedule crews, and manage quality and safety
  • Specialty projects as needed

Qualifications
  • Has obtained an undergraduate AS/ BS degree in Diesel/Automotive Technology, Heavy Equipment Technology, Mechanical Engineering Technology, Construction Management
  • 1+ year of experience with equipment is preferred
  • 1+ year of experience with equipment planning, scheduling, and budgeting is preferred
  • Strong work ethic - Willing to do what it takes to get the job done
  • Strong organizational, time management and communication skills
  • Strong attention to detail and ability to focus on multiple projects at once while prioritizing tasks
  • Willingness to travel and relocate as required
  • Willingness to work in both office and field environments
  • Knowledge of CAD modeling programs is preferred
  • Ability to freely access all points of a construction site or equipment yard in wide-ranging climates and environment

#LI-CA1
Other Requirements:
• Regular, reliable attendance
• Work productively and meet deadlines timely
• Communicate and interact effectively and professionally with supervisors, employees, and others individually or in a team environment
• Perform work safely and effectively. Understand and follow oral and written instructions, including warning signs, equipment use, and other policies.
• Work during normal operating hours to organize and complete work within given deadlines. Work overtime and weekends as required.
• May work at various different locations and conditions may vary.
Base Compensation: 80,000 - 90,000
(Actual compensation is subject to variation due to such factors as education, experience, skillset, and/or location)
This posting will be active from: 06/01/2026 - 09/01/2026
We offer our fulltime staff employees a comprehensive benefits package that's among the best in our industry, including top-tier medical, dental and vision plans covering eligible employees and dependents, voluntary wellness and employee assistance programs, life insurance, disability, retirement plans with matching, and generous paid time off.
Equal Opportunity Employer, including disability and protected veteran status.
There's no limit to what you'll do at Kiewit. Whether you're building or supporting projects that provide communities with dependable energy, safe transportation, clean water, or access to health care, the work you do will positively impact people's lives for generations to come.
Here you'll have endless opportunities to expand your expertise through on-the-job experience and internal and external training and development opportunities.
We offer our full-time staff employees a comprehensive benefits package that's among the best in our industry. From top-tier health care programs to employee assistance programs and retirement planning, we aim to provide you with the tools you need to be successful in the areas of life that matter most to you.
Kiewit is an equal-opportunity employer, and we believe a diverse workforce is vital to the success of our business. We continue our efforts to attract, develop and retain employees from all backgrounds who are passionate about our industry.
We are committed to veteran and military hiring and will consider relevant military experience as equivalent to qualification requirements.

What Kiewit Corporation employees say

Pay

Benefits

Hours and flexibility

Workplace

Get the full story on Breakroom


Kiewit logo

About Kiewit

Sourced by ZipRecruiter

Kiewit Infrastructure Engineering's Design-Build team is driving clients to turn to Kiewit during all stages of design-build projects. Through our integrated design and construction approach, our multi-disciplinary team works together to improve schedule, control costs and minimize risk. Our construction-focused engineers work collaboratively with our estimators and builders to design solutions that are innovative, constructible, and designed with a focus on safety. Clients benefit from the proven processes and tools used by Kiewit to minimize project risk. We are an in-house resource that supports projects throughout the company. Our staff shares experiences gained, innovative concepts, and best practices for all projects that we support.

Industry

Construction materials wholesalers

Company size

10,000+ Employees

Headquarters location

Omaha, NE, US

Year founded

1884