Setting up and rigging large-scale heavy equipment.
Position, align, or level machines, equipment, and or structures.
Shakeout of items to be installed into erectable sequence and rigging of same for crane hoisting with a thorough knowledge and use of crane signals.
Guide rigged items into position using a tag line.
Estimating sizes, distances, and quantities; or determining time, costs, resources, or materials needed to perform a work activity.
Inspect subordinate's work for compliance with the contract plans and specifications, point out deficiencies and explain and take any corrective action needed.
Select riggin components and develop basic rigging procedures for general load handling activities
Identify suitable rigging points for the load to be handled and select the rated rigging based on its anticipated tension
Maintain working understanding of LHE dynamics and their associated hazards