Description
Lodgepole, Sequoia National Park, California. ย
The job site location is approximately 23 miles from the Sequoia National Park Entrance Station, Three Rivers, CA; this will be the base of operations and the approximate location of the job site trailer.
This project rehabilitates the Clover Creek wastewater disposal system damaged by the KNP Fire.ย
Work includes:ย
- Tank restoration (250,000 gal & 15,000 gal)ย
- SCADA system installation and integrationย
- Photovoltaic power system installationย
- Replacement of valves, spray heads, piping, vaultsย
- Coordination with hazardous tree removalย
- Continuous effluent disposal during constructionย
- As-Built survey and closeout documentation
Operational Constraints:
- Maintain minimum three spray fields during summer seasonย
- Limit effluent disposal disruption to 8 hours max with approved Tie-In Planย
- Manual valve access required at all timesย
- Seasonal road closures (Nov-Apr); plan for winter shutdown ย
Period of Performance:
The project timeline is approximately 365 days with a projected start date in mid-late July 2026. Exact dates of performance have yet to be determined and are dependent upon start of construction activities.ย
Requirements
The CMR(s) assigned to this task order shall be able to perform the duties described below:ย
- CMRs shall be knowledgeable in construction practices including applicable building codes, applicable safety regulations, cost breakdown estimating and negotiating, and technical writing.ย
- The CMR(s) shall be computer literate, able to open and manipulate Primavera Project Planner (P3) and Microsoft (MS) Project schedules, or similar, and be proficient in Microsoft Word, Excel, and Project and other commonly used software systems. The CMR(s) must also be able to access and utilize the internet for the facilitation and management of the construction management software system provided by the CM firm under this task order.ย
- The Construction Engineer/CMR shall be knowledgeable in applicable safety regulations and must have a minimum of Occupational Safety and Health Administration (OSHA) 30-hour construction safety training or be able to receive such training within 90 calendar days of award of this task order at no additional cost to the Government.ย
- Additional training may be required such as Federal Information Systems Security training or other NPS required training for gaining access to Government Internet and Intranet systems. Any such NPS required training will be permitted to be performed as part of the CMR's billable hours under this Task Order.ย
- Provide a Resume of the CMR(s) with information including Name, Past CMR project experience, and any pertinent qualifications applicable to CMR Services for Waste-Water Treatment Plant Construction (or equivalent).
General Description of Required Services
- Perform and coordinate project communicationsย
- Coordinate project activities with project stakeholdersย
- Provide on-site administration of the construction contractย
- Facilitate, arrange, and attend meetingsย
- Review and prepare responses to construction submittals and RFIsย
- Maintain a submittal register to be provided to the project stakeholders upon requestย
- Prepare, review, and analyze construction modification documentsย
- Inspect the work of the construction contractor, perform on-site inspections of the construction work, materials, means and methods to ensure compliance with the contract documentsย
- Monitor and inspect the work of the construction contractor to ensure compliance with the project permits and required environmental mitigation measuresย
- Perform special services as specified hereinย
- Perform special inspections as specified hereinย
- Provide the project management software program to be used by all stakeholders for this projectย
All work performed on the park facilities and within the park shall be undertaken with utmost care to ensure respect and preserve the natural and cultural resources. Work shall minimize impacts to park resources and shall comply with all contract and project permit requirements regarding resource protection and mitigation measures.ย
Work shall minimize disruption of on-going NPS operations and facility maintenance activities within the park. The CMR is responsible for coordinating the Construction Contractor's efforts with Park Staff's daily operations.