1

Ms Project Scheduler Jobs Near Me

MS Word, MS Excel, MS Access, MS Project Competent in utilizing Earned Value Method and Critical Path Methodology Firm grasp on scheduling methodology Understanding of the project life cycle as ...

MS Word, MS Excel, MS Access, MS Project Competent in utilizing Earned Value Method and Critical Path Methodology Firm grasp on scheduling methodology Understanding of the project life cycle as ...

next page

Showing results 1-20

Ms Project Scheduler information

See salary details

$38.5K

$115.7K

$144K

How much do ms project scheduler jobs pay per year?

As of Sep 12, 2026, the average yearly pay for ms project scheduler in the United States is $115,711.00, according to ZipRecruiter salary data. Most workers in this role earn between $97,500.00 and $143,000.00 per year, depending on experience, location, and employer.

What cities are hiring for Ms Project Scheduler jobs?

Cities with the most Ms Project Scheduler job openings:

What states have the most Ms Project Scheduler jobs?

States with the most job openings for Ms Project Scheduler jobs include:

A map of the United States highlighting the number of Ms Project Scheduler job openings by state according to ZipRecruiter. The image is accompanied by a detailed chart listing the number of Ms Project Scheduler job openings in each state, with California having the most at 2 and Hawaii the least at 0.

Construction Scheduler

Columbus, OH

Other

Re-posted 10 days ago


Job description

Position Description: Our established construction and design build firm is growing its clientele, and we have an excellent opportunity for an experienced Construction Scheduler to join our talented team of professionals. The Construction Scheduler will be responsible for assisting project teams in preparing and reviewing detailed baseline schedules for assigned projects using Primavera P6 software, Procore and other scheduling software as necessary. This is the perfect opportunity to build a career at a leading Federal Government and general construction Design Build firm.
IAP Design Build LLC is working on many projects in the pre-construction and construction phase in parallel. The time schedule is a very important tool to keep control over the projects. Therefore, we are looking to fill the role of a Construction Scheduler in our organization. The holder of this position will create and maintain project schedules of several projects in pre-construction and the construction phase globally. The responsibility of this person is to keep record of all things happening which have impact on the planning. He/she oversees the various project schedules and will report back to the Project Manager and/or our President/CEO.
Position Responsibilities: Develop, manage, update, and monitor individual project schedules and integrated overall master program schedule.
Review project documents and specifications to accurately develop baseline schedules which include all required dates, activities and milestones.
Perform progress schedule update reviews to include comprehensive reporting and narratives.
Review schedule, progress and productivity of consultants and contractors, monitor and verify monthly costs and earned value, conduct change order management and control.
Develop, manage, and monitor program and project specific budgets, cash flow projections and forecasts.
Cost and resource management and reporting
Establish and ensure scheduling and cost control standards are implemented.
Progress payment application reporting.
Participate in meetings with project teams, clients, owners and various stakeholders related to the project controls and schedule of a particular project.
Development and analysis of what-if scenarios including risk mitigation strategies and support for the tracking of key performance metrics (CPI, SPI, critical path, float density, variance, etc.)
Delay and Time Impact Analysis of Schedule
Quality adhere and verify quality standards are met within deliverables produced by project team, consultants, and contract.
Knowledge, Skills and Abilities: Job Skills and Qualifications - Bachelors Degree in in Architecture, Engineering, or Construction Management.
7+ years of experience in design/build, commercial or industrial ground-up construction scheduling
PMI-SP, PSP (Planning and Schedule Professional) preferred but not required.
Experience with advanced scheduling principles using Primavera 6 (P6), MS Project, Procore or other related system applications is required.
Excellent verbal, communication, and interpersonal skills; Proficiency with Microsoft Office especially Word and Excel.
Prior work experience with a Construction Management, General Contractor, Architectural or Engineering firm. Preferred but not required. Physical Requirements: Ability to work full-time (8am 5pm)
Non-remote position
Must be able to travel to job site locations
Must be able to work in high pressure situations facing strict deadlines.
- Based on Experience -