2

Mid Level Remote Project Scheduler Jobs (NOW HIRING)

This is a 100% remote position. The position may be hybrid if the employee is local, in the San ... Supervision Level: Reports to Manager, Project Controls. May be assigned to support program ...

This is a 100% remote position. The position may be hybrid if the employee is local, in the San ... Supervision Level: * Reports to Manager, Project Controls. * May be assigned to support program ...

Summary: The Project Controls Scheduler will develop and maintain integrated EPC schedules on a ... This role is fully remote. Specific location details and expectations will be discussed during the ...

Summary: The Project Controls Scheduler will develop and maintain integrated EPC schedules on a ... This role is fully remote. Specific location details and expectations will be discussed during the ...

None Clearance Level Must Be Able to Obtain: Secret Potential for Remote Work: ORA_HYBRID Description SAIC is seeking an experienced Project Scheduler join our team. The Scheduler will support a ...

$59K - $87K/yr

Ability to Obtain Level of Experience: Mid This opportunity resides with Warfare Systems (WS) , a ... remote locations, tireless focus on the mission and making projects a reality, and an innovative ...

Overview About This Role 100% Remote The project staffing coordinator is responsible for providing ... High level of attention to detail. * Strong, flexible team player that works to meet both personal ...

Description PROJECT SCHEDULER This position can be based out of any of our regional offices or fully remote. About Arch Key ArchKey is one of the nation's largest privately held specialty trade ...

The Project Scheduler plays a critical role in developing, maintaining, and communicating project ... Ability to work effectively with remote and distributed teams * Candidate must be within 1 hour of ...

TechOps Engineer - Mid Level About the Role? We're looking for a hands-on Mid-Level TechOps ... Although position is remote employee will be required to visit data center on a quarterly basis. It ...

TechOps Engineer - Mid Level About the Role? We're looking for a hands-on Mid-Level TechOps ... Although position is remote employee will be required to visit data center on a quarterly basis. It ...

The Project Scheduler plays a critical role in developing, maintaining, and communicating project ... Ability to work effectively with remote and distributed teams * Candidate must be within 1 hour of ...

Project Scheduler

Boston, MA · On-site +1

$97K - $129K/yr

Owns monthly budget, schedule, change management tracking, and project risk reporting. Works ... Problem-solving can-do attitude and high level of coordination skills. Demonstrated effectiveness ...

next page

Showing results 1-20

Mid Level Remote Project Scheduler information

See salary details

$38.5K

$115.7K

$144K

How much do mid level remote project scheduler jobs pay per year?

As of Sep 8, 2026, the average yearly pay for mid level remote project scheduler in the United States is $115,711.00, according to ZipRecruiter salary data. Most workers in this role earn between $97,500.00 and $143,000.00 per year, depending on experience, location, and employer.

What cities are hiring for Mid Level Remote Project Scheduler jobs?

Cities with the most Mid Level Remote Project Scheduler job openings:

What are the most commonly searched types of Remote Project Scheduler jobs?

The most popular types of Remote Project Scheduler jobs are:

What states have the most Mid Level Remote Project Scheduler jobs?

States with the most job openings for Mid Level Remote Project Scheduler jobs include:

Infographic showing various Mid Level Remote Project Scheduler job openings in the United States as of August 2026, with employment types broken down into 88% Full Time, 8% Part Time, and 4% Contract. Highlights an 83% Physical, 5% Hybrid, and 12% Remote job distribution, with an average salary of $115,711 per year, or $55.6 per hour.

Project Scheduler

4Liberty

San Diego, CA • On-site, Remote

Full-time

Re-posted 16 days ago


Job description

Location: This is a 100% remote position. The position may be hybrid if the employee is local, in the San Diego, California region. Hybrid work model: 60% on-site as needed, 40% remote.

General Summary: The Project Scheduler leverages scheduling software to develop project plans and QA/QC, monitor, control, and update schedules according to project scope. This position is responsible for generating forecasts, variance reports, and additional documentation to monitor and manage projects. Supervision Level: Reports to Manager, Project Controls.

May be assigned to support program managers, project managers, or special project assignments. Responsibilities: Prepare plans and schedules for multiple projects varying in scope and size. Collect and analyze information used to plan and schedule projects.

Research and report on economic, legal, and additional factors impacting project success. Partner with multiple stakeholders to gather deliverable statuses and updates. Communicate timely and accurate updates (schedules, activity codes, constraints, logic, etc.)

Leverage Primavera (P6) scheduling software to manage project schedule statuses, develop project plans, and monitor deadlines and deliverables. Perform what-if schedule scenarios and advanced schedule analysis. Prepare detailed project reports, summaries, variance, and cost analysis reports; present to stakeholders.

Perform other duties as assigned.