1

Ul 508A Jobs (NOW HIRING)

CONTROL PANEL DESIGNER (UL 508A)

Inglewood, CA · On-site

$19.75 - $25.25/hr

Marvin Group is seeking a UL 508A Control Panel Designer to develop industrial control-panel enclosure, layout, and manufacturing-documentation packages. The role owns panel hardware definition and ...

CONTROL PANEL DESIGNER (UL 508A)

Inglewood, CA · On-site

$19.75 - $25.25/hr

Marvin Group is seeking a UL 508A Control Panel Designer to develop industrial control-panel enclosure, layout, and manufacturing-documentation packages. The role owns panel hardware definition and ...

CONTROL PANEL DESIGNER (UL 508A)

Inglewood, CA

$19.75 - $25.25/hr

Marvin Group is seeking a UL 508A Control Panel Designer to develop industrial control-panel enclosure, layout, and manufacturing-documentation packages. The role owns panel hardware definition and ...

Verify the use of UL-recognized and UL-listed components as required by UL 508A. * Confirm compliance with SCCR requirements and documentation. * Verify proper wire sizing, conductor routing, spacing ...

Panel Shop Technician

Paducah, KY · On-site

$18.75 - $25.25/hr

Butler Supply is seeking a UL 508A Panel Shop Technician to join our team at Hannan Supply. This role involves assembling, wiring, and testing electrical control panels in compliance with UL 508A ...

Verify the use of UL-recognized and UL-listed components as required by UL 508A. * Confirm compliance with SCCR requirements and documentation. * Verify proper wire sizing, conductor routing, spacing ...

WEG Electric Corp. is hiring a Senior Engineering Manager - Panel Engineering (UL 508A) . The Senior Engineering Manager - Panel Engineering leads the engineering and design function responsible for ...

WEG is hiring a Senior Engineering Manager - Panel Engineering (UL 508A) . The Senior Engineering Manager - Panel Engineering leads the engineering and design function responsible for UL 508A listed ...

WEG Electric Corp. is hiring a Senior Engineering Manager Panel Engineering (UL 508A) . The Senior Engineering Manager Panel Engineering leads the engineering and design function responsible for UL ...

WEG Electric Corp. is hiring a Senior Engineering Manager Panel Engineering (UL 508A) . The Senior Engineering Manager Panel Engineering leads the engineering and design function responsible for UL ...

Control Panel Designer

Berkeley, CA · On-site

$50 - $150/hr

Design industrial control panels in compliance with NEC (NFPA 70) and UL 508A standards. * Develop complete control panel schematics, layouts, and bills of materials (BOM) using EPLAN or equivalent ...

Control Panel Designer

Berkeley, CA · On-site

$50 - $150/hr

Design industrial control panels in compliance with NEC (NFPA 70) and UL 508A standards. * Develop complete control panel schematics, layouts, and bills of materials (BOM) using EPLAN or equivalent ...

Following NEC, UL 508A, safety, and workmanship standards A current Industrial Control Panel Wireman posting from Integrated Mill Systems includes reading blueprints, following point-to-point wiring ...

next page

Showing results 1-20

Ul 508A information

See salary details

$44

$49

$53

How much do ul 508a jobs pay per hour?

As of Sep 13, 2026, the average hourly pay for ul 508a in the United States is $49.52, according to ZipRecruiter salary data. Most workers in this role earn between $47.36 and $51.68 per hour, depending on experience, location, and employer.

What is a UL 508A panel builder?

UL 508A panel builders are professionals or companies who design, assemble, and label industrial control panels in accordance with the UL 508A safety standard. This standard, developed by Underwriters Laboratories (UL), specifies requirements for the construction of industrial control panels to ensure they meet necessary safety guidelines for use in the United States. UL 508A panel builders are responsible for selecting components, wiring, and building panels that comply with these standards, and they often undergo certification or inspection processes to validate compliance. Having a UL 508A label on a control panel assures customers and inspectors that the panel meets recognized safety standards, helping to reduce risks and ensure regulatory acceptance.

What skills and qualifications are needed to thrive as a UL 508A panel builder?

To thrive as a UL 508A Panel Builder, you need a solid understanding of electrical schematics, wiring practices, and UL 508A standards, typically supported by relevant technical training or experience in electrical panel assembly. Familiarity with tools like multimeters, wire strippers, and CAD software, as well as knowledge of UL certification requirements, is crucial. Attention to detail, problem-solving skills, and effective communication are important soft skills for quality work and collaboration. These abilities ensure panels are built safely, comply with regulations, and meet customer specifications.

What are typical challenges faced by UL 508A panel builders during project execution?

UL 508A panel builders often encounter challenges such as interpreting complex customer specifications, ensuring all components meet UL 508A standards, and managing tight project deadlines. Effective communication with design engineers, procurement teams, and quality inspectors is essential to resolve technical issues and avoid delays. Staying current with evolving standards and documentation requirements is also crucial to maintain compliance and ensure successful panel inspections.

What is the difference between Ul 508A vs Electrician?

CriteriaUl 508AElectrician
CertificationsUL 508A Certification for control panelsState-specific electrical licenses
Work EnvironmentManufacturing, panel assemblyConstruction sites, maintenance, installation
Industry UsageControl panel manufacturing, industrial automationElectrical installation and repair

Ul 508A focuses on the design and manufacturing of industrial control panels, requiring specific UL certification. Electricians perform electrical installations, repairs, and maintenance in various settings. While both roles involve electrical work, Ul 508A pertains to panel fabrication standards, whereas electricians handle on-site electrical tasks.

How to become UL 508A certified?

To become UL 508A certified, a manufacturer must submit their control panel designs for review, ensure compliance with UL 508A standards, and pass an inspection by UL or an authorized testing agency. Certification involves demonstrating proper wiring, component selection, and adherence to safety requirements, often requiring ongoing quality control and documentation.
More about Ul 508A jobs

What cities are hiring for Ul 508A jobs?

Cities with the most Ul 508A job openings:

What states have the most Ul 508A jobs?

States with the most job openings for Ul 508A jobs include:

Infographic showing various Ul 508A job openings in the United States as of September 2026, with employment types broken down into 98% Full Time, 1% Part Time, and 1% Contract. Highlights an 86% Physical, 4% Hybrid, and 10% Remote job distribution, with an average salary of $102,999 per year, or $49.5 per hour.

Electrical Estimator (UL 508A) - 5K Power

Houston, TX • On-site

Hays Electrical Services
Construction • 201 - 500 employees

Full-time

Posted 4 days ago


Hays Electrical Services rating

6.6

Company rating: 6.6 out of 10

Based on 7 frontline employees who took The Breakroom Quiz


Job description


ELECTRICAL ESTIMATOR (UL 508A) 

UL 508A / Custom Electrical Equipment 


About 5K Power 5K Power is an electrical manufacturing and fabrication company providing high-quality power distribution and custom electrical solutions for commercial, industrial, mission-critical, and construction markets. Capabilities include UL-listed equipment, custom control and power panels, temporary power systems, equipment skidding, and engineered-to-order electrical products.

Position Summary The Electrical Estimator reviews customer drawings, specifications, one-lines, panel schedules, and equipment requirements to develop accurate material and labor estimates for custom electrical equipment. The ideal candidate has direct experience estimating, designing, engineering, or manufacturing UL 508A industrial control panels and low-voltage assemblies. This role requires determining components, enclosures, fabrication, wiring, labor, testing, and engineering effort to take a customer concept to a finished product.

Key Responsibilities

Estimating & Quotation

  • Review RFQs, specifications, one-line diagrams, schematics, panel schedules, and drawings.

  • Develop detailed estimates and accurate Bills of Material (BOMs) for custom panels and power distribution equipment.

  • Determine material, fabrication, assembly, wiring, testing, engineering, and production labor requirements.

  • Obtain vendor pricing, evaluate lead times, and identify cost-effective component alternatives while maintaining ratings.

  • Generate complete project pricing for management review and customer quotation.

  • Maintain estimating history and continuously improve standards based on actual production costs.

UL 508A / Electrical Equipment

  • Apply UL 508A standards during estimating and design, including component selection and application.

  • Evaluate voltage, amperage, SCCR, interrupting ratings, conductor sizing, overcurrent protection, and disconnecting means.

  • Utilize knowledge of breakers, disconnects, contactors, starters, relays, power supplies, transformers, terminal blocks, VFDs, and PLCs.

  • Identify UL-compliant component substitutions to resolve lead time or availability issues.

  • Collaborate with engineering and production to ensure designs are efficient and fully compliant.

Design & Preconstruction Support

  • Assist with preliminary panel layouts, equipment configurations, and sizing appropriate NEMA enclosures.

  • Evaluate space requirements and resolve design conflicts or missing details prior to production.

  • Develop conceptual arrangements for incomplete customer designs and support design-build opportunities.

Vendor & Supply Chain Coordination

  • Request and evaluate component manufacturer quotations.

  • Track component pricing, availability, and lead times across major electrical manufacturers.

  • Implement alternate sourcing strategies when specified items impact schedule or cost.

Equipment Experience

Experience estimating or designing one or more of the following is strongly preferred:

  • UL 508A Industrial Control Panels (Required)

  • Custom Electrical Control Panels & Motor Control Panels

  • Power Distribution Panels, Panelboards & Disconnect Assemblies

  • PLC / Automation Panels & VFD Panels

  • Transformer / Distribution Assemblies & Metering Assemblies

  • Temporary Power Distribution Equipment & Mobile Power Equipment

  • Custom NEMA 1 / NEMA 3R Electrical Enclosures

  • Skid-Mounted Electrical Equipment & Switchboards

Qualifications

Required:

  • 3+ years of experience in electrical equipment estimating, panel design, electrical manufacturing, or a related field.

  • Working knowledge of UL 508A and industrial control panel construction.

  • Proficiency in reading one-lines, schematics, wiring diagrams, panel schedules, and specifications.

  • Strong understanding of electrical components, basic calculations (voltage, amperage, protection, sizing), and BOM creation.

  • Excellent communication, organizational, and technical decision-making skills in a fast-paced custom manufacturing setting.

Preferred:

  • UL 508A Manufacturer Technical Representative (MTR) experience or prior panel-shop experience.

  • Familiarity with NEC requirements, SCCR calculations, and major manufacturers (Schneider Electric, Square D, Eaton, Siemens, ABB, Allen-Bradley, etc.).

  • Proficiency with AutoCAD Electrical, AutoCAD, SolidWorks Electrical, or manufacturing ERP/estimating software.

What Success Looks Like Turning an RFQ, sketch, or specification into a buildable, compliant, and profitable 5K Power solution. Working closely across Sales, Engineering, Purchasing, and Production to ensure equipment is accurately priced, cost-effective, and delivered on schedule.
 

 

WHY 5K POWER 

5K Power is building a different type of electrical manufacturing company - one focused on speed, flexibility, practical engineering, and solving customer problems. 

  • UL electrical manufacturing 

  • Custom control and distribution equipment 

  • Temporary Power Solutions 

  • TPS temporary power skids 

  • SBX distribution equipment 

  • Mobile power and charging equipment 

  • Skid-mounted electrical systems 

  • Custom power distribution assemblies 

  • Design-build electrical equipment 

5K Power is a Veteran Operated company. 

Powered by JazzHR

Vi6dM4iO9t


What Hays Electrical Services employees say

Pay

Benefits

Hours and flexibility

Workplace

Get the full story on Breakroom