2

Remote Project Scheduler Jobs in Round Lake, IL (NOW HIRING)

Scheduler I

Rolling Meadows, IL · On-site +1

$56K - $95K/yr

  • Medical

  • Dental

  • Vision

  • Retirement

  • PTO

ABOUT THE ROLE The Scheduler, T&D is a key role for successful project planning and execution. The ... remote location consistent with Company policy * Understand and comply with the Company's Code of ...

Project Manager West Region - Remote

Schaumburg, IL · Remote

$90K - $100K/yr

  • Medical

  • Dental

  • Retirement

Remote with preference for candidates based in PST/MST for regional alignment. This position ... Proactively manage project scope and schedule, as well as manage risks/issues and related ...

Packaging Project Coordinator

Mettawa, IL · Remote

$35 - $38/hr

  • Medical

  • Dental

  • Vision

  • Retirement

Remote (local to Chicago preferred) Start Date: ASAP Duration: 6 Month Contract Compensation Range: $35-$38/hr W2 Benefits: Eligible for Health, Dental, Vision, 401K Visa Sponsorship: Not eligible ...

This position is 100% remote. Responsibilities * Plan, schedule, document and manage activities throughout cloud and AI consulting engagements as a billable project manager * Participate in ...

This position is 100% remote. Responsibilities * Plan, schedule, document and manage activities throughout cloud and AI consulting engagements as a billable project manager * Participate in ...

HR Project Manager (Contract)

Rolling Meadows, IL · On-site +1

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

The Project Manager brings strong change management and communications capabilities, and has a ... schedule based out of our office in Rolling Meadows, IL. We may consider remote candidates ...

Medical Coder - Remote

North Chicago, IL · Remote

$19.25 - $25.50/hr

... project management to strategic planning that strengthen operational efficiency and streamline ... Green Bay Rd., North Chicago, IL 60064) Duration: 1 year + 4 option years Shift Schedule: Monday ...

Civil Engineer

Libertyville, IL · On-site +1

$73K - $130K/yr

  • Medical

  • Dental

  • Vision

  • Life

  • Retirement

Provide technical guidance and plan review for major highway projects led by the Capital Projects team. Office-based, Mon-Fri, 8:00am-4:30pm, with flexible schedules and remote options. * Traffic:

Civil Engineer

Libertyville, IL · On-site +1

$73K - $130K/yr

  • Retirement

Provide technical guidance and plan review for major highway projects led by the Capital Projects team. Office-based, Mon-Fri, 8:00am-4:30pm, with flexible schedules and remote options. Traffic: Play ...

next page

Showing results 1-20

Remote Project Scheduler information

See Round Lake, IL salary details

$36.9K

$111K

$138.1K

How much do remote project scheduler jobs pay per year?

As of Aug 19, 2026, the average yearly pay for remote project scheduler in Round Lake, IL is $110,976.00, according to ZipRecruiter salary data. Most workers in this role earn between $93,500.00 and $137,100.00 per year, depending on experience, location, and employer.

What does a remote project scheduler do?

As a remote project scheduler, you focus on time management and schedule coordination for a project or a company’s operations. Someone in this work from home position is often responsible for creating an effective plan for the completion of each project, so your responsibilities often include finding ways to coordinate the time of project team members and contractors in a way that minimizes costs. A remote project scheduler uses software to organize the schedule and budgetary information, and your duties often include maintaining a record of completed work and the number of hours that employees or contractors work.

What does a remote project scheduler do?

A Remote Project Scheduler is responsible for creating, updating, and maintaining project schedules from a remote location. They work closely with project managers and team members to ensure tasks are properly scheduled and deadlines are met. Using various software tools, they track project progress, identify potential delays, and provide reports to stakeholders. Their goal is to keep projects on track, anticipate scheduling conflicts, and support successful project delivery.

What are the key skills and qualifications needed to thrive as a remote project scheduler, and why are they important?

To thrive as a Remote Project Scheduler, you need strong organizational skills, knowledge of project management methodologies, and experience with scheduling and resource allocation, often backed by a degree in business or a related field. Proficiency in project management software like Microsoft Project, Primavera P6, or Smartsheet, as well as familiarity with collaboration tools such as Slack or Teams, is typically required. Attention to detail, time management, and proactive communication are critical soft skills for coordinating remote teams and handling shifting priorities. These skills and qualities are vital to ensure project timelines are met, resources are optimized, and remote teams remain aligned and productive.

How does a remote project scheduler typically coordinate with project teams across different time zones?

As a Remote Project Scheduler, you’ll often work with teams and stakeholders located in various regions, which can pose challenges in real-time communication and scheduling. To manage this, you’ll use collaborative project management tools and shared calendars to align schedules, set clear deadlines, and ensure transparency. Regular virtual meetings, asynchronous updates, and proactive follow-ups are crucial for keeping everyone informed and on track. Flexibility and strong organizational skills are essential to adjust plans as needed and accommodate diverse working hours.

What is the difference between Remote Project Scheduler vs Remote Project Coordinator?

AspectRemote Project SchedulerRemote Project Coordinator
CertificationsPMI Scheduling Professional, PMP (preferred)CAPM, PMP (optional)
Primary ResponsibilitiesDeveloping and maintaining project schedules, resource allocationAssisting with project tasks, communication, and documentation
Work EnvironmentTypically in project management teams within industries like construction, IT, engineeringSupports project teams across various industries, often in administrative roles

Remote Project Schedulers focus on creating detailed project timelines and managing schedules, requiring specific scheduling certifications. Remote Project Coordinators handle broader project support tasks, often with less emphasis on scheduling certifications. Both roles are vital in project management but differ in scope and responsibilities.

What cities near Round Lake, IL are hiring for Remote Project Scheduler jobs?

Cities near Round Lake, IL with the most Remote Project Scheduler job openings:

Infographic showing various Remote Project Scheduler job openings in Round Lake, IL as of August 2026, with employment types broken down into 78% Full Time, 15% Part Time, and 7% Contract. Highlights an 100% Remote job distribution, with an average salary of $110,976 per year, or $53.4 per hour.

Scheduler I

MYR Group

Rolling Meadows, IL • On-site, Remote

$56K - $95K/yr

Full-time

Medical, Dental, Vision, Retirement, PTO

Re-posted 11 hours ago


MYR Group rating

7.1

Company rating: 7.1 out of 10

Based on 9 frontline employees who took The Breakroom Quiz


Job description

ABOUT THE ROLE

The Scheduler, T&D is a key role for successful project planning and execution. The Scheduler I is responsible to prepare, monitor, update, maintain, and submit contract schedules on multiple projects as assigned. The Scheduler I or II will collaborate regularly with supervision, project management, and project teams for the ongoing efforts related to project planning & scheduling.

Company Overview

With roots dating to 1891 and 8,500+ employees, MYR Group Inc. (MYR Group) is a publicly traded holding company of specialty electrical construction companies. MYR Group subsidiaries work on large-scale electrical construction projects throughout the U.S. and Canada. We contribute to a clean energy future while fostering a safe, supportive, and inclusive work environment. Our culture is built on shared values and mutual respect, where teamwork and collaboration occur naturally.

Throughout our rich history, we have partnered with utilities, municipalities, commercial clients, and developers to deliver some of the largest and most complex projects, including new construction, upgrades, maintenance and repair for transmission, distribution and substation facilities, commercial and industrial electrical construction, emergency and storm restoration, clean energy, pre-construction services, and engineer-procure-construct (EPC) methods of project delivery.

Our company’s Transmission and Distribution (T&D) division offers a comprehensive range of electrical services including transmission, distribution, substation and clean energy construction. We are experienced in delivering reliable, high-quality infrastructure solutions to meet the growing demands of the power and utility industry.

Essential Functions

  • Perform detailed scheduling, including the development and updating of project schedules, activity relationships, variance reports, and progress updates
  • Develop and produce project related reports
  • Attend weekly project meetings to review schedule and plans, gather status updates, and provide continual scheduling support for periodic updates and claims mitigation
  • Produce quantifiable data for use in mitigating schedule delay and disruption by other trades
  • Regular and predictable attendance
  • Essential functions of this position are to be performed in a Company-designated office and an appropriate remote location consistent with Company policy
  • Understand and comply with the Company’s Code of Business Conduct and Ethics Policy and other industry-specific professional and ethical standards

Additional responsibilities may include:

  • Develop Critical Path Method (CPM) schedules for contracted projects and proposals
  • Support leadership and multiple project teams by preparing, monitoring, and updating construction schedules in Primavera P6 or Microsoft Project
  • May work with project management to assist with various duties such as writing RFI’s, preliminary schedule to be included in RFP responses, miscellaneous tracking/monitoring, and preparing submittals for the client, i.e. As-Built documents
  • Develop revenue forecasts from the project plan/schedule and update monthly with guidance from project management
  • Other duties as assigned
  • Essential functions of this position are to be performed in a Company-designated office or field location
  • Understand and comply with the Company's Code of Business Conduct and Ethics and other industry-specific professional and ethical conduct standards

ABOUT YOU

Qualifications

    • Minimum 2 years of experience with Primavera P6 scheduling software
    • Minimum 2 years of experience construction scheduling
    • Experience in transmission, distribution, substation or renewable construction projects preferred

Knowledge/Skills/Abilities

  • Advanced proficiency in creating, maintaining/updating and reporting schedules in Primavera P6 scheduling software
  • Ability to plan, monitor, and report project schedules to customers
  • Self-motivated with ability to work in a team environment with strong interpersonal skills
  • Strong technical skills
  • Proficiency with Microsoft Office Suite, especially MS Project and Excel
  • Proactive self-starter with demonstrated initiative
  • Excellent analytical, organizational, verbal, written, and communication skills
  • Ability to travel up to 25% 

WHAT WE OFFER
  • Salary $56,548-$95,000/year
    • Commensurate with experience, paid weekly. Posted salary ranges are made in good faith. MYR Group reserves the right to adjust ranges depending on the qualifications of the selected candidate.
  • Comprehensive benefits package - Medical, Basic Vision, Regenexx, Teledoc, Hearing, Mental Health (Low deductibles and out-of-pocket maximums) - Fifteen Dollar weekly premium for employee or employee plus family coverage.
  • Dental – 100% employer-paid premium.
  • ThrivePass Health & Wellness Reimbursement Program - Twelve hundred dollars annually for health and wellbeing-related purchases.
  • Annual Paid Time Off starting at 15 days plus 10 paid Holidays (Cultural Celebration Day is a floating holiday).
  • Generous 401(k) Plan with 100% match up to 6%; immediate vesting, and Annual profit-sharing potential.
  • Superior educational assistance program (support for educational costs, internal training, and more!).
  • Company-paid short and long-term disability, life, and accidental death & dismemberment.
  • Company-paid business travel accident insurance.
  • Employee Assistance Plan (EAP).
  • Various voluntary plans available including supplemental vision, accident and critical illness, ID theft, group legal, group auto & home, and additional voluntary life insurance plans for employees and dependents.


    This position will remain posted for a minimum of three days. The posting will remain active and automatically extend until the vacancy is filled.

Position may be subject to pre-employment screening, which may include background check and drug testing. Accessibility: If you need an accommodation as part of the employment process, contact our Employment Hotline at 1-855-635-1321.

MYR Group, Inc. and our subsidiaries are proud to be Equal Opportunity Employers. We promote diversity of thought, culture, and background, which connects our family of brands. We are committed to a work environment that supports, inspires, and respects all individuals and in which personnel processes are merit-based and applied without discrimination on the basis of race, color, religion, sex, sexual orientation, gender identity, marital status, age, disability, national or ethnic origin, military service status, or other protected characteristics. We celebrate diversity and are committed to creating an inclusive environment for all employees.

MYR Group does not sponsor applicants for work visas. Applicants must be currently authorized to work in the United States for any employer.

MYR Group, Inc. and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Talent Acquisition Team.

Qualifications:
  • Salary $56,548-$95,000/year
    • Commensurate with experience, paid weekly. Posted salary ranges are made in good faith. MYR Group reserves the right to adjust ranges depending on the qualifications of the selected candidate.
  • Comprehensive benefits package - Medical, Basic Vision, Regenexx, Teledoc, Hearing, Mental Health (Low deductibles and out-of-pocket maximums) - Fifteen Dollar weekly premium for employee or employee plus family coverage.
  • Dental – 100% employer-paid premium.
  • ThrivePass Health & Wellness Reimbursement Program - Twelve hundred dollars annually for health and wellbeing-related purchases.
  • Annual Paid Time Off starting at 15 days plus 10 paid Holidays (Cultural Celebration Day is a floating holiday).
  • Generous 401(k) Plan with 100% match up to 6%; immediate vesting, and Annual profit-sharing potential.
  • Superior educational assistance program (support for educational costs, internal training, and more!).
  • Company-paid short and long-term disability, life, and accidental death & dismemberment.
  • Company-paid business travel accident insurance.
  • Employee Assistance Plan (EAP).
  • Various voluntary plans available including supplemental vision, accident and critical illness, ID theft, group legal, group auto & home, and additional voluntary life insurance plans for employees and dependents.


    This position will remain posted for a minimum of three days. The posting will remain active and automatically extend until the vacancy is filled.

Position may be subject to pre-employment screening, which may include background check and drug testing. Accessibility: If you need an accommodation as part of the employment process, contact our Employment Hotline at 1-855-635-1321.

MYR Group, Inc. and our subsidiaries are proud to be Equal Opportunity Employers. We promote diversity of thought, culture, and background, which connects our family of brands. We are committed to a work environment that supports, inspires, and respects all individuals and in which personnel processes are merit-based and applied without discrimination on the basis of race, color, religion, sex, sexual orientation, gender identity, marital status, age, disability, national or ethnic origin, military service status, or other protected characteristics. We celebrate diversity and are committed to creating an inclusive environment for all employees.

MYR Group does not sponsor applicants for work visas. Applicants must be currently authorized to work in the United States for any employer.

MYR Group, Inc. and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Talent Acquisition Team.

Education:UNAVAILABLEEmployment Type: FULL_TIME

What MYR Group employees say

Pay

Benefits

Hours and flexibility

Workplace

Get the full story on Breakroom