1

Bess Jobs in California (NOW HIRING)

Lead PV / BESS Master Technician Commercial Solar | Utility-Scale Solar | Battery Energy Storage | Commissioning | O&M Location: Multiple Sites / Regional Travel Required Job Type: Full-Time Level:

As a Lead Battery Energy Storage System (BESS) Services Technician, you will be responsible for leading complex electrical and mechanical projects. We are looking for experienced field professionals ...

Advanced BESS Technician

Blythe, CA · On-site

$25 - $40/hr

To learn more about Pearce visit Your Impact The Experienced Travel Battery Energy Storage System (BESS) Technician in the PEARCE Renewables Energy Storage Systems (ESS) division performs tasks ...

To learn more about Pearce visit Your Impact The Experienced Travel Battery Energy Storage System (BESS) Technician in the PEARCE Renewables Energy Storage Systems (ESS) division performs tasks ...

Showing results 41-60

Bess information

What is a Bess?

The term 'Bess' does not refer to a specific job title in most professional contexts. It may be a misspelling or abbreviation of another role, or possibly a company name or acronym. If you meant 'BES' as in Building Energy Specialist or 'BESS' as in Battery Energy Storage System specialist, please clarify for more accurate information. Otherwise, please provide additional context or check the spelling of the job title you are interested in.

What are the key skills and qualifications needed to thrive as a Bess, and why are they important?

I'm sorry, but 'Bess' does not appear to be a recognized real-world professional occupation, so I cannot provide an accurate response.

What is the difference between Bess vs HVAC Technician?

AspectBessHVAC Technician
Required CredentialsCertification in BESS system operation, safety trainingHVAC certification, EPA refrigerant handling license
Work EnvironmentEnergy storage facilities, renewable energy sitesResidential, commercial, and industrial HVAC systems
Employer & Industry UsageRenewable energy companies, energy storage providersHVAC service companies, construction firms
Common Search & ComparisonYesYes

While both Bess specialists and HVAC Technicians work in technical environments, Bess professionals focus on energy storage systems, whereas HVAC Technicians handle heating, ventilation, and air conditioning systems. Their certifications, work settings, and industry applications differ, making each role unique in the energy and building management sectors.

What are the most commonly searched types of Bess jobs in California?

The most popular types of Bess jobs in California are:

What are popular job titles related to Bess jobs in California?

For Bess jobs in California, the most frequently searched job titles are:

What job categories do people searching Bess jobs in California look for?

The top searched job categories for Bess jobs in California are:

What cities in California are hiring for Bess jobs?

Cities in California with the most Bess job openings:

Infographic showing various Bess job openings in California as of August 2026, with employment types broken down into 97% Full Time, 1% Part Time, and 2% Contract. Highlights an 76% Physical, 6% Hybrid, and 18% Remote job distribution.

Staff BESS Electrical Design Engineer (EPC) - San Francisco

MiconeStaffing

San Francisco, CA • On-site

$190K - $252K/yr

Full-time

Re-posted 5 days ago


Job description

Staff BESS Electrical Design Engineer (EPC) — Architect the Grid's Battery Future

San Francisco, CA | Full-Time | $190,000 – $252,500

The Opportunity

Every megawatt-hour of grid storage that comes online needs an engineer who understands both sides of the inverter. Our client — a rapidly scaling clean energy innovator — is hiring a Staff BESS Electrical Design Engineer to lead utility-scale lithium-ion storage projects from first concept through energization. As Electrical Engineer of Record and the company's internal BESS authority, you'll shape how grid-scale batteries get designed, interconnected, and built — with top-of-market compensation to match the responsibility.

Why You'll Love It

  • Premium pay: $190K–$252.5K base
  • Dual authority: EOR on your projects and company-wide SME on all things BESS
  • Complete design scope: AC and DC systems, from battery modules to the utility interconnection
  • Push the frontier: Lead R&D into MV-DC distribution for next-generation storage integration

What You'll Do

  • Lead utility-scale lithium-ion BESS engineering — system sizing and layout through construction
  • Design AC and DC systems with MV transformers, inverters, DC combiners, energy managers, and battery modules; specify and procure long-lead equipment
  • Develop schematics, single-lines, wiring diagrams, raceway and grounding plans, and protection strategies
  • Interface with utilities and ISO/RTOs on interconnection studies, submittals, permitting, and compliance
  • Lead code compliance across NEC 705/706, IEEE 1547, UL 9540, and NFPA 855
  • Perform short circuit, load flow, arc flash, and protective device coordination studies for AC and DC systems
  • Serve as Electrical Engineer of Record for assigned projects
  • Coordinate civil, structural, fire & life safety, SCADA/telecom, and geotech teams into complete IFC packages
  • Support construction administration — RFIs, submittals, change orders, site inspections
  • Prepare cost estimates and schedules, QA/QC designs, mentor junior engineers, and set design standards

What You'll Bring

  • BS/MS in Electrical Engineering (ABET)
  • Active PE (Nevada or reciprocity-eligible); NV and SC licensure within 2 months of start
  • 5+ years in solar, energy storage, or microgrids, including 3+ in BESS design and deployment
  • Proven BESS interconnection and regulatory compliance expertise
  • SME-level command of NEC 705/706, IEEE 1547, UL 9540, NFPA 855
  • Advanced proficiency: HOMER (or similar), ETAP/SKM, AutoCAD/Revit, Navisworks, Bluebeam
  • Bonus points: PSSE/PSLF, PSCAD, SEL AcSELerator, HVDC/converter station design
  • Working fluency in peak shaving, load shifting, demand response, and frequency response

Design the storage systems the grid is waiting for. Apply now.