1

Temporary Power Plant Outage Jobs (NOW HIRING)

WI ยท On-site

$120 - $180/hr

Power Plant Engineer SpaceX is building and operating combined-cycle gas turbine power plants that ... Own root-cause analysis and corrective action for turbine trips, forced outages, and performance ...

WI ยท On-site

$120 - $180/hr

Power Plant Engineer SpaceX is building and operating combined-cycle gas turbine power plants that ... Own rootโ€‘cause analysis and corrective action for turbine trips, forced outages, and performance ...

WI ยท On-site

$120 - $170/hr

POWER PLANT ENGINEER SpaceX is building and operating combined-cycle gas turbine power plants that ... Own rootโ€‘cause analysis and corrective action for turbine trips, forced outages, and performance ...

Track forced outages, derates, and loss of generation events, conducting Root Cause Analyses (RCA ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

Track forced outages, derates, and loss of generation events, conducting Root Cause Analyses (RCA ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

Track forced outages, derates, and loss of generation events, conducting Root Cause Analyses (RCA ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

Power Plant Manager

Leesburg, VA ยท On-site

$200K - $275K/yr

Oversee maintenance and outage planning and provide owner reports on key outage events. Required Skills / Knowledge: * Proven track record of meeting goals. * Strong understanding of power plant ...

Power Plant Facility Manager

Syracuse, NY ยท On-site

$160K - $190K/yr

EthosEnergy is recruiting a Power Plant Facility Manager to join our team at Carr Street Generating ... Provide outage reports to the owner summarizing significant events of outages. Required Skills ...

We are engineers, high line workers, power plant managers, accountants, electricians, project ... Drives the effective development, and efficient performance of projects and station outages ...

We are engineers, high line workers, power plant managers, accountants, electricians, project ... Drives the effective development, and efficient performance of projects and station outages ...

We are engineers, high line workers, power plant managers, accountants, electricians, project ... Drives the effective development, and efficient performance of projects and station outages ...

Investigate equipment failures, forced outages, and generation losses; perform root cause analyses ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

Power Plant Engineer

MD ยท On-site

Investigate equipment failures, forced outages, and generation losses; perform root cause analyses ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

Power Plant Engineer

Aquasco, MD ยท On-site

$145K - $175K/hr

Investigate equipment failures, forced outages, and generation losses; perform root cause analyses ... Power plant environment that may involve entering confined spaces, crawling through narrow areas ...

next page

Showing results 1-20

Temporary Power Plant Outage information

See salary details

$20

$44

$63

How much do temporary power plant outage jobs pay per hour?

As of Aug 22, 2026, the average hourly pay for temporary power plant outage in the United States is $44.71, according to ZipRecruiter salary data. Most workers in this role earn between $30.05 and $58.65 per hour, depending on experience, location, and employer.

What is a temporary power plant outage?

A temporary power plant outage refers to a planned or unplanned period when a power plant is taken offline and stops generating electricity. These outages are often scheduled for routine maintenance, repairs, or upgrades to ensure the safety, efficiency, and reliability of the facility. During such outages, plant personnel perform inspections, service equipment, and address any issues that could impact long-term operations. While outages can disrupt power supply, they are necessary to prevent larger, unexpected problems in the future.

What are some common challenges faced by workers during a temporary power plant outage assignment?

During a temporary power plant outage, workers often face challenges such as working under tight deadlines to complete maintenance or repairs before the plant resumes operation. The environment can be fast-paced, with extended shifts and the need for strict adherence to safety protocols due to potential hazards. Collaboration with multidisciplinary teams, including engineers, technicians, and safety personnel, is crucial to ensure tasks are completed efficiently. Job seekers should be prepared for physically demanding work, variable schedules, and the need to quickly adapt to changing priorities.

What are the key skills and qualifications needed to thrive as a temporary power plant outage technician, and why are they important?

To thrive as a Temporary Power Plant Outage Technician, you need a solid understanding of mechanical and electrical systems, safety procedures, and relevant technical training or certifications such as OSHA or NCCER. Familiarity with industrial maintenance tools, lockout/tagout systems, and computerized maintenance management systems (CMMS) is typically required. Strong teamwork, problem-solving abilities, and effective communication are essential soft skills for coordinating with crews and responding quickly to unexpected issues. These competencies ensure outages are managed safely, efficiently, and with minimal disruption to plant operations.

What is the difference between Temporary Power Plant Outage vs Power Plant Technician?

AspectTemporary Power Plant OutagePower Plant Technician
CredentialsRelevant certifications like OSHA, safety trainingTechnical certifications, such as HVAC, electrical, or mechanical licenses
Work EnvironmentShort-term, site-specific outages during maintenance or repairsOngoing work at power plants, maintenance, and operational support
Employer & Industry UsageUtility companies, contractors during outagesPower generation facilities, utility companies

Temporary Power Plant Outage roles focus on short-term, site-specific tasks during planned outages, requiring safety certifications. Power Plant Technicians perform ongoing maintenance and operational duties at power plants, often with technical licenses. Both roles are essential in the energy industry but differ mainly in duration and scope of work.

More about Temporary Power Plant Outage jobs

What cities are hiring for Temporary Power Plant Outage jobs?

Cities with the most Temporary Power Plant Outage job openings:

What are the most commonly searched types of Power Plant Outage jobs?

The most popular types of Power Plant Outage jobs are:

What states have the most Temporary Power Plant Outage jobs?

States with the most job openings for Temporary Power Plant Outage jobs include:

What job categories do people searching Temporary Power Plant Outage jobs look for?

The top searched job categories for Temporary Power Plant Outage jobs are:

Infographic showing various Temporary Power Plant Outage job openings in the United States as of August 2026, with employment types broken down into 100% Full Time. Highlights an 100% In-person job distribution, with an average salary of $93,004 per year, or $44.7 per hour.

$120 - $180/hr

Other

Posted 4 days ago


Job description

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today SpaceX is actively developing the technologies to make this possible, with the ultimate goal of enabling human life on Mars.

Power Plant Engineer

SpaceX is building and operating combined-cycle gas turbine power plants that must come online, stay online, and perform. This role owns the design and build of the full power plant: gas turbines, mechanical and electrical balance of plant, and everything else that keeps the plant running at rated output, day after day. This is not a desk job. You will be constructing the power plant, owning commissioning in the control room during startup, and in the field troubleshooting.

Responsibilities:
  • Support the full lifecycle of gas turbine power generation assets โ€” installation, commissioning, startup, operations, and long-term maintenance
  • Lead or support commissioning activities including combustion tuning, control system checkout, protective relay testing, and performance/reliability run verification
  • Own root-cause analysis and corrective action for turbine trips, forced outages, and performance degradation; drive fixes that prevent recurrence
  • Develop and refine operating procedures, startup/shutdown sequences, and abnormal operating condition playbooks
  • Interface directly with OEMs (GE, Siemens Energy, Mitsubishi Power, Doosan) on warranty issues, LTSA scope, outage planning, and technical issues
  • Plan and execute major/minor inspections, hot gas path outages, and combustion inspections in line with OEM maintenance intervals
  • Analyze turbine performance data (heat rate, capacity factor, degradation curves) to identify efficiency losses and recommend corrective action
  • Coordinate with balance-of-plant teams (HRSG, steam turbine, cooling systems, water treatment) to ensure integrated performance
  • Build and maintain relationships with EPC contractors during construction handoff to ensure a clean transition from construction to commercial operation
  • Develop spare parts strategy, critical spares inventory, and maintenance budgets
Basic Qualifications:
  • Bachelorโ€™s degree in Mechanical Engineering, Electrical Engineering, or a related engineering discipline
  • 2+ years of handsโ€‘on experience with utilityโ€‘scale gas turbines in commissioning, operations, or maintenance roles
Preferred Skills and Experiences:
  • Working knowledge of combinedโ€‘cycle plant systems: gas turbines, HRSGs, steam turbines, generators, and balanceโ€‘ofโ€‘plant equipment
  • Experience reading and interpreting P&IDs, singleโ€‘line diagrams, and turbine control logic
  • Direct commissioning experience with GE 7/9HA, Siemens Energy SGT6/8โ€‘8000H, Mitsubishi M501/701JAC, or Doosan Hโ€‘class turbines
  • Experience with DCS/turbine control platforms (Mark VIe, SPPAโ€‘T3000, or equivalent)
  • Familiarity with LTSA structures, OEM contract negotiation, and outage scope development
  • Background in rootโ€‘cause failure analysis (RCA/5โ€‘Why/Fishbone) for rotating equipment
  • Experience with performance monitoring tools and heat balance modeling
  • Exposure to grid interconnection requirements, PPA performance obligations, or capacity market rules
  • Experience integrating power generation with coโ€‘located industrial or data center loads
  • A bias toward action: comfortable making a call in the field without waiting for a committee
  • Demonstrated ability to work under pressure during startup, outages, or unplanned events, with a sense of urgency and ownership over outcomes
  • Experience using SOLIDWORKS, Siemens NX, or similar CAD software
  • Knowledge of engineering standards and best practices such as ASME B31.3, ASME BPV Code Section VIII, and AFSPCMAN 91โ€‘710
Additional Requirements:
  • Schedule varies depending on site operational needs; must be willing to work extended hours and/or weekends as business needs require
  • Flexibility to travel to other SpaceX sites
  • Ability to perform job duties that require standing, kneeling, crouching, twisting upper body, working in cramped positions in small openings and climbing hand over hand
  • Typically exposed to work in outdoor environments โ€“ heat, cold, rain
  • Stand: Up to 3 hours per day
  • Sit: Up to 6 hours per day
  • Push/Pull: Up to 50lbs. (unassisted) Up to 15 minutes per day
  • Overhead reach: Up to 3 hours per day
  • Walk: Up to 3 hours per day
  • Lift/Carry: Up to 25lbs. (unassisted) Up to 15 minutes per day
  • Climb (ladder/stairs): Up to 1 hour per day
  • Kneel/Crouch: N/A
  • Upper body twist: N/A
  • Ability to work in temperatures over 80 degrees: up to 30 minutes per day
  • Candidate must be capable of safely working at heights (up to 500ft), in confined spaces, using an air purifying respirator, and performing the physical requirements of the job listed in the job description. Candidate may be required to complete a preโ€‘employment questionnaire and/or physical to confirm these capabilities, which may include a medical history review.
ITAR Requirements:
  • To conform to U.S. Government export regulations, applicant must be a (i) U.S. citizen or national, (ii) U.S. lawful, permanent resident (aka green card holder), (iii) Refugee under 8 U.S.C. ยง 1157, or (iv) Asylee under 8 U.S.C. ยง 1158, or be eligible to obtain the required authorizations from the U.S. Department of State. Learn more about the ITAR here.

SpaceX is an Equal Opportunity Employer; employment with SpaceX is governed on the basis of merit, competence and qualifications and will not be influenced in any manner by race, color, religion, gender, national origin/ethnicity, veteran status, disability status, age, sexual orientation, gender identity, marital status, mental or physical disability or any other legally protected status.

Applicants wishing to view a copy of SpaceXโ€™s Affโ€ฆ EEOCompliance@spacex.com.

#J-18808-Ljbffr