1

Temp Baseboard Installation Jobs (NOW HIRING)

Carpenter

Dallas, TX · On-site +1

$30.12 - $35.12/hr

Constructs new drywall partitions and other temporary structures of wood construction. * Installs ... Cuts and installs trim material around new work and cased openings such as baseboard, ceiling mold ...

Non-Exempt Temporary/Continuing: Continuing Part-Time/Full-Time: Full-Time Union Group: Custodial ... Perform skilled trades work in assembling, repairing, and installing various plumbing systems ...

Plumber

Big Rapids, MI · On-site

$30.30/hr

Non-Exempt Temporary/Continuing: Continuing Part-Time/Full-Time: Full-Time Union Group: Custodial ... Perform skilled trades work in assembling, repairing, and installing various plumbing systems ...

Plumber

Big Rapids, MI · On-site

$30.30/hr

Non-Exempt Temporary/Continuing: Continuing Part-Time/Full-Time: Full-Time Union Group: Custodial ... Perform skilled trades work in assembling, repairing, and installing various plumbing systems ...

Temp Baseboard Installation information

See salary details

$14

$26

$36

How much do temp baseboard installation jobs pay per hour?

As of Jul 14, 2026, the average hourly pay for temp baseboard installation in the United States is $26.97, according to ZipRecruiter salary data. Most workers in this role earn between $23.32 and $30.53 per hour, depending on experience, location, and employer.
What are the most commonly searched types of Baseboard Installation jobs? The most popular types of Baseboard Installation jobs are:

Flooring Installation Technician (Temporary - 6 Month Project)

Regard Healthcare

Sherrodsville, OH • On-site

$21/hr

Full-time, Temporary

Posted 6 days ago

New


Job description

Flooring Installation Technician (Temporary – 6 Month Project)

Location: Sherrodsville, OH, 44675

Job Type: Temporary (6-Month Project)

Schedule: Full-Time

Pay: $21.00 per hour

Position Overview

We are hiring 2–3 Flooring Installation Technicians to support a six-month plus facility renovation project. This is a temporary, full-time opportunity for individuals with hands-on flooring installation experience who are dependable, detail-oriented, and take pride in producing quality work.

The ideal candidate will have experience with carpet removal, floor preparation, waterproof vinyl flooring installation, and finish carpentry, including baseboard installation.

Responsibilities
  • Remove existing carpet and flooring materials.
  • Prepare subfloors, including leveling and surface preparation.
  • Measure, cut, glue, and install waterproof vinyl plank flooring.
  • Install baseboards and finish trim.
  • Operate hand and power tools safely and effectively.
  • Maintain a clean, organized, and safe work environment.
  • Work collaboratively with the project team to complete the flooring installation on schedule.
  • Follow all company safety policies and procedures.
Qualifications
  • Previous experience installing flooring is required.
  • Experience with:
    • Carpet removal
    • Floor leveling and subfloor preparation
    • Cutting, gluing, and installing waterproof vinyl flooring
    • Baseboard installation
  • Ability to read a tape measure and accurately measure and cut materials.
  • Strong attention to detail and commitment to quality workmanship.
  • Reliable transportation and dependable attendance.
Physical Requirements
  • Ability to lift and carry up to 50 pounds.
  • Frequently bend, kneel, crouch, and stand for extended periods.
  • Ability to work in an active renovation environment.
  • Comfortable using hand and power tools throughout the workday.
What We Offer
  • $21.00 per hour
  • Full-time, temporary position (approximately 6 months)
  • Immediate openings for 2–3 technicians
  • Opportunity to work on a facility improvement project with a collaborative team

If you have flooring installation experience and are looking for a six-month project where you can put your skills to work, we'd love to hear from you.