1

Primavera P6 Jobs in Nevada (NOW HIRING)

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are ...

next page

Showing results 1-20

Primavera P6 information

See Nevada salary details

$26

$56

$84

How much do primavera p6 jobs pay per hour?

As of Sep 3, 2026, the average hourly pay for primavera p6 in Nevada is $56.03, according to ZipRecruiter salary data. Most workers in this role earn between $47.02 and $63.65 per hour, depending on experience, location, and employer.

What is a Primavera P6?

A Primavera P6 job typically involves project planning, scheduling, and management using Oracle Primavera P6 software. Professionals in this role create and maintain project schedules, allocate resources, track progress, and ensure timely project completion. Industries like construction, engineering, manufacturing, and IT use Primavera P6 for complex project management. Skills in critical path method (CPM) scheduling, resource optimization, and risk analysis are often required.

What are the typical responsibilities of someone working in a Primavera P6 role?

Professionals working with Primavera P6 are primarily responsible for developing, updating, and maintaining detailed project schedules, often for large-scale construction or engineering projects. They collaborate closely with project managers, engineers, and other stakeholders to gather activity data, sequence tasks, and monitor project progress against key milestones. The role frequently requires analyzing schedule delays, preparing reports, and recommending actions to keep projects on track. This position offers the opportunity to work in fast-paced environments where strong analytical skills and teamwork are essential to drive project success.

What are the key skills and qualifications needed to thrive in the Primavera P6 position, and why are they important?

To thrive in a Primavera P6 role, you need strong project scheduling, planning, and management skills, typically supported by a relevant degree in engineering, construction management, or a related field. Proficiency in Oracle Primavera P6 software, and familiarity with industry standards (such as PMI or AACE certifications), are highly valued. Attention to detail, effective communication, and strong organizational abilities are key soft skills for success. These competencies are essential to create accurate project schedules, coordinate teams, and ensure projects are delivered on time and within budget.

What jobs use Primavera P6?

Primavera P6 is commonly used by project managers, schedulers, and planning engineers in industries such as construction, engineering, and oil and gas. These professionals utilize Primavera P6 for project scheduling, resource management, and project control to ensure timely and efficient project delivery.

What are the most commonly searched types of Primavera P6 jobs in Nevada?

The most popular types of Primavera P6 jobs in Nevada are:

What are popular job titles related to Primavera P6 jobs in Nevada?

For Primavera P6 jobs in Nevada, the most frequently searched job titles are:

What cities in Nevada are hiring for Primavera P6 jobs?

Cities in Nevada with the most Primavera P6 job openings:

Infographic showing various Primavera P6 job openings in Nevada as of August 2026, with employment types broken down into 100% Full Time. Highlights an 93% In-person, and 7% Hybrid job distribution, with an average salary of $116,542 per year, or $56 per hour.

Senior Scheduler

EC Source

Las Vegas, NV • On-site

$150K/yr

Full-time

Re-posted 24 days ago


Job description

Overview
As one of the nation's leading electric transmission line construction companies, MasTec Power Delivery companies engineer and construct efficient and reliable electrical transmission, distribution, and substation & switchyard systems. Our extensive workforce includes both union and nonunion teams, which, combined with our specialized equipment fleet, allows us to effectively meet our clients' needs for power delivery, emergency restoration, and ongoing maintenance. We've been involved in some of the most challenging and recognizable electric projects across the U.S. From the electric plant to the end users, MasTec's experienced managers and crews consistently deliver transmission, distribution, and substation & switchyard services with an unfailing commitment to safety, integrity, and sustainable practices.
Salary range: $130-150,000 per year
We are currently seeking a Senior Project Scheduler to support our growing Power Delivery Segment. The Senior Project Scheduler will be responsible for developing and maintaining project schedules and various baselines, ensuring compliance with company policies, client requirements, and ongoing analysis of network logic. This role requires resource/cost loading for all project schedules. Analyze critical path and constraints to determine effect of changes to schedule and recommend workarounds. Suggest mitigation of risks affecting project profit, costs, schedules, and client relations. Utilizing Primavera P6 software, the Planner/Scheduler will also be responsible for communicating and advising the project team on corrective actions when necessary. Additional responsibilities are as follows:
Responsibilities
  • Schedule Baseline Creation and Maintenance: Generate and update project baseline schedules using Primavera P6 and Critical Path Methodology. Maintain additional baselines as the project moves forward.
  • Cost and Resource Loading: Ensure all schedules include resource and cost data.
  • Network Logic Analysis and Validation: Perform ongoing analysis and validation of network logic to ensure it aligns with project team intent and standard guidelines. Remove unnecessary dependencies that could affect total float calculations and project criticality.
  • Periodic Progress Updates: Conduct weekly and monthly updates for schedules in progress by gathering necessary data from various resources, such as Project Managers, Superintendents, financial controller, EVM analyst and other members of the project team.
  • Performance Reporting: Generate weekly/monthly project performance reports, including Critical Activities Reports, Baseline Deviation Reports, Earned Value Performance Index Reports, and Commodity Curves. Reporting includes writing a monthly Schedule Narrative.
  • Perform CPI/SPI calculations using earned value principles.
  • Conduct analysis to determine alternative courses of action or recovery on slipped schedules

Skills & Abilities:
  • Must be proficient in use of Primavera P6 and CPM methodology for building and maintaining construction schedules.
  • Knowledge of PMI, Primavera P6, and AACE best practices for Scheduling.
  • Proven ability with creating reports by relating and extracting data from a variety of software platforms.
  • Excellent written and verbal communication skills.
  • Proficient in MS Office, Word, Excel, PowerPoint and Outlook.
  • Experience using P6 with Tilos software is desirable.
  • Problem solving, time management and organizational skills required.

Qualifications
Education and/or Work Experience:
  • 8-10 years' experience in scheduling construction projects
  • BS degree with an emphasis in Engineering or Construction Management - or equivalent experience.
  • Previous experience working on large overhead transmission line and substation projects is a preference. At least, experience in other Mega linear construction at a minimum.
  • Extensive engineering and construction experience, preferably with respect to substation and transmission construction (A preference, but not required)