Key Responsibilities • Develop, maintain, and update detailed project schedules in Oracle Primavera P6. • Support electric utility distribution capital projects across planning, engineering ...
Key Responsibilities • Develop, maintain, and update detailed project schedules in Oracle Primavera P6. • Support electric utility distribution capital projects across planning, engineering ...
Key Responsibilities • Develop, maintain, and update detailed project schedules in Oracle Primavera P6. • Support electric utility distribution capital projects across planning, engineering ...
Key Responsibilities • Develop, maintain, and update detailed project schedules in Oracle Primavera P6. • Support electric utility distribution capital projects across planning, engineering ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Support operations leadership with workforce planning and forecasting for active and upcoming ... Advanced proficiency with Primavera P6 scheduling software required. * Strong understanding of ...
Support operations leadership with workforce planning and forecasting for active and upcoming ... Advanced proficiency with Primavera P6 scheduling software required. * Strong understanding of ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Support operations leadership with workforce planning and forecasting for active and upcoming ... Advanced proficiency with Primavera P6 scheduling software required. * Strong understanding of ...
Support operations leadership with workforce planning and forecasting for active and upcoming ... Advanced proficiency with Primavera P6 scheduling software required. * Strong understanding of ...
P6 Scheduler Data Center
Columbus, OH · On-site
$80K - $100K/yr
Required Qualifications: * 5+ years of experience as a Scheduler, Planning Engineer, or Project Controls Scheduler . * Strong, hands-on experience with Primavera P6 . * Experience on data center ...
Quick apply
P6 Scheduler Data Center
Columbus, OH · On-site
$80K - $100K/yr
Required Qualifications: * 5+ years of experience as a Scheduler, Planning Engineer, or Project Controls Scheduler . * Strong, hands-on experience with Primavera P6 . * Experience on data center ...
P6 Scheduler
San Jose, CA · On-site
Prepare look-ahead schedules and support pull planning. * Maintain documentation for change orders, RFIs, and time impact analyses. Must-Haves * Hands-on Primavera P6 scheduling on commercial ...
Quick apply
P6 Scheduler
San Jose, CA · On-site
Prepare look-ahead schedules and support pull planning. * Maintain documentation for change orders, RFIs, and time impact analyses. Must-Haves * Hands-on Primavera P6 scheduling on commercial ...
P6 Scheduler
Grand Prairie, TX · On-site
Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex construction projects.
P6 Scheduler
Grand Prairie, TX · On-site
Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex construction projects.
P6 Business Systems Analyst
Boston, MA · On-site
Primavera P6 Certified Professional. * PMP, CBAP, or CCBA certifications. * Power BI, SharePoint, SQL, and Power Platform experience. * Experience with ERP integrations and ITIL practices. Core ...
P6 Business Systems Analyst
Boston, MA · On-site
Primavera P6 Certified Professional. * PMP, CBAP, or CCBA certifications. * Power BI, SharePoint, SQL, and Power Platform experience. * Experience with ERP integrations and ITIL practices. Core ...
P6 Business Systems Analyst
Boston, MA · On-site
Primavera P6 Certified Professional. * PMP, CBAP, or CCBA certifications. * Power BI, SharePoint, SQL, and Power Platform experience. * Experience with ERP integrations and ITIL practices. Core ...
P6 Business Systems Analyst
Boston, MA · On-site
Primavera P6 Certified Professional. * PMP, CBAP, or CCBA certifications. * Power BI, SharePoint, SQL, and Power Platform experience. * Experience with ERP integrations and ITIL practices. Core ...
P6 Scheduler
Grand Prairie, TX · On-site
About this Role Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex ...
P6 Scheduler
Grand Prairie, TX · On-site
About this Role Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex ...
P6 Scheduler
Grand Prairie, TX · On-site
About this Role Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex ...
P6 Scheduler
Grand Prairie, TX · On-site
About this Role Northstar Energy Solutions is looking for a highly skilled Construction Project Scheduler with deep expertise in Primavera P6 to support the planning and execution of complex ...
Develop and maintain detailed schedules using Primavera P6 and Microsoft Project * Monitor project ... Experience in cost planning and project-controls reporting interfaces Preferred Qualifications
Quick apply
Develop and maintain detailed schedules using Primavera P6 and Microsoft Project * Monitor project ... Experience in cost planning and project-controls reporting interfaces Preferred Qualifications
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Quick apply
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Oracle Primavera P6 EPPM Cloud Additionally, with all 3 these applications and modules targeted to integrate with Oracle ERP Cloud (incl. Oracle Cloud EPM, Finance, PPM, SCM, HCM and others) in ...
Quick apply
Oracle Primavera P6 EPPM Cloud Additionally, with all 3 these applications and modules targeted to integrate with Oracle ERP Cloud (incl. Oracle Cloud EPM, Finance, PPM, SCM, HCM and others) in ...
P6 Project Schedueler
Tucson, AZ · On-site
Support project teams during schedule reviews, planning sessions, and coordination meetings * Train and mentor internal staff on the effective use of Primavera P6 and scheduling best practices ...
P6 Project Schedueler
Tucson, AZ · On-site
Support project teams during schedule reviews, planning sessions, and coordination meetings * Train and mentor internal staff on the effective use of Primavera P6 and scheduling best practices ...
Planner / Scheduler
Pecos, TX · On-site
Working knowledge of Primavera P6. * Ability to operate effectively in a fast-paced project ... planning and scheduling experience. About Airswift: Airswift is an international workforce ...
Planner / Scheduler
Pecos, TX · On-site
Working knowledge of Primavera P6. * Ability to operate effectively in a fast-paced project ... planning and scheduling experience. About Airswift: Airswift is an international workforce ...
P6 Scheduler - Utilities (Denver, CO)
Denver, CO · On-site
$111K - $145K/yr
... Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients. About This Role Schedulers (Primavera P6) Location: 1050 17th Street, Denver, CO 80265 ...
New
P6 Scheduler - Utilities (Denver, CO)
Denver, CO · On-site
$111K - $145K/yr
... Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients. About This Role Schedulers (Primavera P6) Location: 1050 17th Street, Denver, CO 80265 ...
New
Primavera P6 Planner information
See salary details
$33K - $40.3K
4% of jobs
$40.3K - $47.5K
9% of jobs
$54K is the 25th percentile. Wages below this are outliers.
$47.5K - $54.8K
14% of jobs
$54.8K - $62.1K
18% of jobs
The median wage is $64.5K / yr.
$62.1K - $69.4K
16% of jobs
$69.4K - $76.6K
13% of jobs
$77.8K is the 75th percentile. Wages above this are outliers.
$76.6K - $83.9K
10% of jobs
$83.9K - $91.2K
9% of jobs
$91.2K - $98.5K
4% of jobs
$98.5K - $105.7K
3% of jobs
$105.7K - $113K
1% of jobs
$33K
$69.6K
$113K
How much do primavera p6 planner jobs pay per year?
What is a Primavera P6 planner?
A Primavera P6 Planner is responsible for creating, managing, and maintaining project schedules using Oracle's Primavera P6 software. They work closely with project managers, engineers, and stakeholders to ensure timely project execution by tracking progress, identifying risks, and optimizing schedules. Their role involves analyzing timelines, resource allocation, and critical paths to improve efficiency and meet deadlines. Primavera P6 Planners are commonly found in industries like construction, engineering, oil & gas, and infrastructure projects.
What are the typical daily responsibilities of a Primavera P6 planner?
As a Primavera P6 Planner, your typical day involves developing and updating detailed project schedules, monitoring progress, and identifying potential risks or delays. You'll coordinate with project managers, engineers, and other team members to gather accurate data and ensure alignment with project goals. Additionally, you'll generate regular reports, analyze critical paths, and recommend adjustments to keep the project on track. This role is both technical and collaborative, making clear communication and attention to detail essential for success.
What are the key skills and qualifications needed to thrive in the Primavera P6 planner position, and why are they important?
To thrive as a Primavera P6 Planner, you need a solid background in project management, scheduling, and a relevant degree in engineering, construction management, or a related field. Expertise in using Oracle Primavera P6 software, with certifications such as PMP or Primavera P6 Professional Certification, is highly valuable. Strong analytical, organizational, and communication skills help you effectively manage complex schedules and collaborate with diverse project teams. These skills are essential for delivering projects on time and within budget while ensuring clarity and efficiency across stakeholders.
What are popular job titles related to Primavera P6 Planner jobs?
For Primavera P6 Planner jobs, the most frequently searched job titles are:

Project Controls Scheduler - Electric Distribution (Primavera P6)
Akron, OH • On-site
Full-time
Retirement
Re-posted 3 days ago
Key responsibilities
Develop, maintain, and update detailed project schedules in Oracle Primavera P6.
Support electric utility distribution capital projects across planning, engineering, procurement, construction, and closeout.
Support project controls reporting, including schedule status, milestone tracking, variance analysis, look-ahead reporting, and management dashboards.
Job description
Location: Akron, OH
Job Type: Full-Time
Experience Level: 4+ years
About Us
CARIAN is a purpose-driven, woman-owned consulting and advisory firm dedicated exclusively to the power sector. We partner with leading electric and gas utilities to provide strategic advisory and disciplined execution across program management, business intelligence, and field execution oversight. Guided by integrity, trust, excellence, and accountability, our team helps deliver complex capital programs and build the resilient energy infrastructure that communities depend on.
Position Overview
CARIAN is seeking a Project Controls Scheduler - Electric Distribution (Primavera P6) to support major electric utility distribution capital programs. This role will be responsible for developing, maintaining, analyzing, and reporting on detailed project schedules in Oracle Primavera P6.
The ideal candidate has strong project controls and scheduling experience, advanced analytical skills, and the ability to work closely with project managers, engineers, construction teams, contractors, and client stakeholders. This role requires strong attention to detail, schedule discipline, and the ability to support multiple active distribution projects in a fast-paced utility program environment.
This role may be based in Morristown, NJ; Akron, OH; or Reading, PA, with client-site presence and travel as required by project needs.
Key Responsibilities
• Develop, maintain, and update detailed project schedules in Oracle Primavera P6.
• Support electric utility distribution capital projects across planning, engineering, procurement, construction, and closeout.
• Develop and maintain schedule activities, logic, milestones, durations, dependencies, resources, and progress updates.
• Support multiple project managers concurrently across active distribution projects and programs.
• Coordinate schedule updates with project managers, engineers, construction teams, contractors, and client stakeholders.
• Perform schedule quality checks to confirm accuracy, logic integrity, sequencing, and alignment with project requirements.
• Analyze schedule performance, critical path, milestones, constraints, and variances and support development of corrective actions or recovery plans.
• Track project progress and identify potential schedule risks, delays, dependencies, and execution constraints.
• Support project controls reporting, including schedule status, milestone tracking, variance analysis, look-ahead reporting, and management dashboards.
• Integrate and analyze schedule data using Microsoft Excel and other reporting tools.
• Support alignment of schedule information with project cost, forecast, and other project controls data.
• Participate in project meetings and provide schedule updates, analysis, and recommendations as needed.
• Maintain organized schedule files, logs, reports, and supporting project documentation.
• Support project closeout activities, including final schedule updates and documentation turnover.
Qualifications
- Bachelor's degree in Engineering, Construction Management, Business, Project Management, or a related field required.
- 4+ years of experience in project controls, scheduling, construction management, or capital project delivery.
- Hands-on experience with Oracle Primavera P6 required.
- Strong understanding of schedule development, activity sequencing, logic ties, critical path analysis, progress measurement, schedule updates, and variance reporting.
- Proficiency with Microsoft Excel, including formulas, pivot tables, data analysis, and reporting.
- Ability to analyze schedule data and communicate findings clearly to project teams and stakeholders.
- Strong written and verbal communication skills.
- Strong analytical, organizational, and problem-solving skills.
- Ability to manage multiple projects and competing priorities in a fast-paced environment.
- Ability to work collaboratively with project managers, engineers, construction teams, contractors, project controls personnel, and client representatives.
- Valid driver's license required.
- Ability to work at client and project locations as required.
Preferred Experience
- Experience supporting electric utility distribution projects or capital programs.
- Experience with distribution feeders, substations, system improvements, reliability, capacity, asset replacement, or other electric distribution infrastructure.
- Experience supporting projects through engineering, procurement, construction, and closeout.
- Experience with cost tracking, forecasting, or integrated project controls reporting.
- Utility client or consulting experience.
Why CARIAN
Purpose-driven work - Help deliver infrastructure that powers communities.
Industry reputation - Trusted by leading utilities for our reliability and results.
Career growth - Opportunities to lead major programs and mentor high-performing teams.
Collaborative culture - Join a team that values delivery excellence and long-term relationships.
Competitive total rewards - Strong compensation, full benefits, 401(k) match, and meaningful work.
Equal Employment Opportunity
CARIAN is proud to be an equal opportunity employer. We hire and develop talent based on qualifications, performance, and business needs. Employment decisions are made without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other protected characteristic. As a women-owned firm dedicated to the power sector, we are committed to building a team that reflects professionalism, expertise, and integrity at every level.