LABOR ONLY Scope of Work:
ALL HAND LOAD AND DOWNLOAD
GC to provide equipment, materials, permit, and warranty required for project.
Subcontractor to follow all OSHA requirements.
Remove the existing wall and penetration flashings and debris from the roof surface.
Install sheathing substrate at asphalt contaminated base flashing substrates.
Install one (1) layer of mechanically attached poly-iso insulation with the insulation joints staggered. (147 SQs).
Sump installation included.
Install mechanically attached 60 mil reinforced TPO membrane in the field of the roof.
The membrane will be allowed sufficient time to relax prior to installation.
The membrane sheets will be hot air welded. Each seam will be probed to ensure securement.
The newly installed membrane will be tied into the existing surrounding roof daily.
Install fully adhered 60 mil reinforced TPO membrane at all curbs and walls.
Plates and fasteners will be used to secure the membrane at the base flashings 12 OC.
The membrane will be terminated at all applicable walls with a termination bar and counterflashing.
Install pipe boots, sealant pockets, penetration flashings, universal corners, and t-joints where applicable.
Install cut edge sealant at the exposed edges of all field cut reinforced TPO membrane.
Install TPO clad drip edge metal at the perimeter of the roof system (840).
Install counterflashing metal (185).
Install coping cap metal at screen wall (120).
Install walkways to match the existing layout (225).
Remove debris and dispose of with GCs dumpsters.
Perform punch list items determined by manufacturer and GC
Provide 2-year workmanship warranty.
Excludes raising existing rooftop curbs or penetrations.
Exclusions:
Working on overtime, weekends, holidays; Asbestos removal; Certified payroll, Credit Card Payments, Wet insulation replacement; Temporary roof install; Interior protection, Replacement of collector heads, downspouts, coping metal; Materials; Permit; Rental equipment; Structural repairs.