Project Controls Scheduler - Primavera P6 Location: Akron, OH; Reading, PA; or Morristown, NJ Job ... Manage project schedules across various phases, including planning, engineering, procurement ...
Project Controls Scheduler - Primavera P6 Location: Akron, OH; Reading, PA; or Morristown, NJ Job ... Manage project schedules across various phases, including planning, engineering, procurement ...
Monitor resource loading, productivity trends, and schedule forecasting to support project planning ... Advanced proficiency in Primavera P6. * Experience developing and maintaining CPM schedules for ...
Monitor resource loading, productivity trends, and schedule forecasting to support project planning ... Advanced proficiency in Primavera P6. * Experience developing and maintaining CPM schedules for ...
Reporting directly to the Director of Operations, this position serves as the central planning and ... Architect complete Primavera P6 project schedules for MEP construction projects, including baseline ...
Reporting directly to the Director of Operations, this position serves as the central planning and ... Architect complete Primavera P6 project schedules for MEP construction projects, including baseline ...
Project Controls Scheduler - Primavera P6 Location: Akron, OH; Reading, PA; or Morristown, NJ Job ... Manage project schedules across various phases, including planning, engineering, procurement ...
Project Controls Scheduler - Primavera P6 Location: Akron, OH; Reading, PA; or Morristown, NJ Job ... Manage project schedules across various phases, including planning, engineering, procurement ...
Construction Scheduler Primavera P6 Expert
Manhattan, NY · On-site
$100 - $125/hr
Demonstrated proficiency in Primavera P6 and/or Primavera Expedition scheduling software * Experience in developing logical sequencing of work, contract durations, and phasing plans * Experience in ...
Construction Scheduler Primavera P6 Expert
Manhattan, NY · On-site
$100 - $125/hr
Demonstrated proficiency in Primavera P6 and/or Primavera Expedition scheduling software * Experience in developing logical sequencing of work, contract durations, and phasing plans * Experience in ...
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Quick apply
Planner/Scheduler
New Orleans, LA · On-site
... using Primavera P6 (preferred) or Microsoft Project for industrial projects within an EP/EPC ... planning, scheduling, and cost control for industrial engineering and construction projects ...
Project Planner/Scheduler
Casper, WY · On-site
$100 - $125/hr
Essential ResponsibilitiesProject Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Project Planner/Scheduler
Casper, WY · On-site
$100 - $125/hr
Essential ResponsibilitiesProject Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Project Planner/Scheduler
Casper, WY · On-site
Essential Responsibilities Project Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Project Planner/Scheduler
Casper, WY · On-site
Essential Responsibilities Project Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Data Center Project Scheduler (Primavera P6)
Monroe, LA · Hybrid
$50 - $58/hr
If you're highly skilled with Primavera P6 , understand construction scheduling, and enjoy ... Support forecasting, planning, and earned value reporting * Communicate schedule changes and ...
Data Center Project Scheduler (Primavera P6)
Monroe, LA · Hybrid
$50 - $58/hr
If you're highly skilled with Primavera P6 , understand construction scheduling, and enjoy ... Support forecasting, planning, and earned value reporting * Communicate schedule changes and ...
Essential Responsibilities Project Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Essential Responsibilities Project Planning & Scheduling ... Develop, maintain, and update detailed project schedules using Primavera P6. * Build resource ...
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Quick apply
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Quick apply
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Construction Scheduler Primavera P6 Expert
Long Island City, NY · On-site
$80K - $120K/yr
The successful candidate will develop, maintain, and analyze project schedules for new construction, rehabilitation, and addition projects across New York City public schools, utilizing Primavera P6 ...
Quick apply
Construction Scheduler Primavera P6 Expert
Long Island City, NY · On-site
$80K - $120K/yr
The successful candidate will develop, maintain, and analyze project schedules for new construction, rehabilitation, and addition projects across New York City public schools, utilizing Primavera P6 ...
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Quick apply
Be Seen First
Planner Scheduler
Boise, ID · On-site
$110K - $130K/yr
Develop comprehensive project schedules using Primavera P6, Microsoft Project, or other ... Join us as a Construction Planner / Scheduler to be a vital part of innovative projects that shape ...
Data Center Project Scheduler (Primavera P6)
Monroe, LA · Hybrid
$50 - $58/hr
If you're highly skilled with Primavera P6 , understand construction scheduling, and enjoy ... Support forecasting, planning, and earned value reporting * Communicate schedule changes and ...
Data Center Project Scheduler (Primavera P6)
Monroe, LA · Hybrid
$50 - $58/hr
If you're highly skilled with Primavera P6 , understand construction scheduling, and enjoy ... Support forecasting, planning, and earned value reporting * Communicate schedule changes and ...
Planner Scheduler
Akron, OH · On-site
Maintain the Level 3/4 schedule in Primavera P6 in coordination with the Project Scheduler while ... Minimum 7 years of experience as Planner Scheduler or Engineering Lead in directing schedule ...
Planner Scheduler
Akron, OH · On-site
Maintain the Level 3/4 schedule in Primavera P6 in coordination with the Project Scheduler while ... Minimum 7 years of experience as Planner Scheduler or Engineering Lead in directing schedule ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Support re-planning and re-baselining when major schedule changes occur, including pre-rebaseline ... Working experience using Primavera P6 or similar software for scheduling and schedule analysis ...
Planner/Scheduler
Munster, IN · On-site
Planner/Scheduler Driven by Vision | Industrial-Strength Construction | Powered by Passion OVERVIEW ... Maintain expert knowledge of Primavera P6 (V 15.1 or later), including activity coding, resource ...
Planner/Scheduler
Munster, IN · On-site
Planner/Scheduler Driven by Vision | Industrial-Strength Construction | Powered by Passion OVERVIEW ... Maintain expert knowledge of Primavera P6 (V 15.1 or later), including activity coding, resource ...
Planner/Scheduler
Munster, IN · On-site
Planner/Scheduler Driven by Vision | Industrial-Strength Construction | Powered by Passion OVERVIEW ... Maintain expert knowledge of Primavera P6 (V 15.1 or later), including activity coding, resource ...
Planner/Scheduler
Munster, IN · On-site
Planner/Scheduler Driven by Vision | Industrial-Strength Construction | Powered by Passion OVERVIEW ... Maintain expert knowledge of Primavera P6 (V 15.1 or later), including activity coding, resource ...
Primavera P6 Planner Scheduler information
See salary details
$15.14 - $20.30
4% of jobs
$24.99 is the 25th percentile. Wages below this are outliers.
$20.30 - $25.46
23% of jobs
$25.46 - $30.62
15% of jobs
$30.62 - $35.77
4% of jobs
$35.77 - $40.93
3% of jobs
The median wage is $41.67 / hr.
$40.93 - $46.09
7% of jobs
$46.09 - $51.25
16% of jobs
$53.18 is the 75th percentile. Wages above this are outliers.
$51.25 - $56.40
8% of jobs
$56.40 - $61.56
10% of jobs
$61.56 - $66.72
5% of jobs
$66.72 - $71.87
4% of jobs
$15
$42
$71
How much do primavera p6 planner scheduler jobs pay per hour?
What does a Primavera P6 planner scheduler do?
What are some common challenges faced by Primavera P6 planner schedulers when managing multiple large-scale projects simultaneously?
What are the key skills and qualifications needed to thrive as a Primavera P6 planner scheduler, and why are they important?
What cities are hiring for Primavera P6 Planner Scheduler jobs?
Cities with the most Primavera P6 Planner Scheduler job openings:
What are popular job titles related to Primavera P6 Planner Scheduler jobs?
For Primavera P6 Planner Scheduler jobs, the most frequently searched job titles are:
Project Controls Scheduler - Primavera P6
Akron, OH • On-site
Full-time
Retirement
Posted 28 days ago
Job description
Location: Akron, OH; Reading, PA; or Morristown, NJ
Job Type: Full-Time
Experience Level: 4+ years
About Us
CARIAN is a purpose-driven, woman-owned consulting and advisory firm dedicated exclusively to the power sector. We partner with leading electric and gas utilities to provide strategic advisory and disciplined execution across program management, business intelligence, and field execution over
sight. Guided by integrity, trust, excellence, and accountability, our team helps deliver complex capital programs and build the resilient energy infrastructure that communities depend on.
Position Overview
CARIAN is seeking a Project Controls Scheduler - Primavera P6 to support major electric utility transmission and distribution programs. This role will be responsible for developing, maintaining, analyzing, and reporting on detailed project schedules in Oracle Primavera P6.
The ideal candidate has strong project controls and scheduling experience, advanced analytical skills, and the ability to work closely with project managers, engineers, construction teams, contractors, and client stakeholders. This role requires strong attention to detail, schedule discipline, and the ability to support multiple active projects in a fast-paced utility program environment.
This role may be based in Akron, OH; Reading, PA; or Morristown, NJ, with occasional client site visits as needed.
Key Responsibilities
- Develop, maintain, and update detailed project schedules in Oracle Primavera P6.
- Support electric utility transmission, distribution, substation, and related infrastructure projects.
- Manage project schedules across various phases, including planning, engineering, procurement, construction, and closeout.
- Support multiple project managers concurrently across active utility projects.
- Load, maintain, and validate schedule data, including activities, logic, milestones, durations, resources, and progress updates.
- Perform schedule quality checks to confirm accuracy, logic integrity, and alignment with project requirements.
- Analyze schedule performance, identify variances, and support development of corrective actions or recovery plans.
- Track project progress and coordinate schedule updates with project managers, engineers, construction teams, contractors, and client stakeholders.
- Support project controls reporting, including schedule status, milestone tracking, variance analysis, lookahead reports, and management dashboards.
- Integrate and analyze scheduling data using Microsoft Excel and other reporting tools.
- Support cost and schedule alignment by coordinating with project controls, finance, and project management teams.
- Identify potential schedule risks and support mitigation planning.
- Maintain organized project schedule files, logs, reports, and supporting documentation.
- Participate in project meetings and provide scheduling updates, analysis, and recommendations as needed.
- Support project closeout activities, including final schedule updates and documentation turnover.
Qualifications
- Bachelor's degree in Engineering, Construction Management, Business, Project Management, or a related field required.
- 4+ years of experience in project controls, scheduling, construction management, or capital project delivery.
- Hands-on experience with Oracle Primavera P6 required.
- Experience supporting electric utility, transmission, distribution, substation, energy, infrastructure, or construction projects preferred.
- Strong understanding of schedule development, activity sequencing, logic ties, critical path analysis, progress updates, and variance reporting.
- Proficiency with Microsoft Excel, including formulas, pivot tables, data analysis, and reporting.
- Ability to analyze schedule data and communicate findings clearly to project teams and stakeholders.
- Strong written and verbal communication skills.
- Strong analytical, organizational, and problem-solving skills.
- Ability to support multiple projects and priorities in a fast-paced environment.
- Ability to work collaboratively with project managers, engineers, construction teams, contractors, project controls staff, and client representatives.
- Experience with cost tracking, forecasting, or project controls reporting is a plus.
- Utility client or consulting experience is a plus.
- Valid driver's license required.
- Ability to perform occasional client site visits as needed.
Why CARIAN
- Purpose-driven work - Help deliver infrastructure that powers communities
- Industry reputation - Trusted by leading utilities for our reliability and results
- Career growth - Opportunities to support major grid modernization programs and expand technical leadership capabilities
- Collaborative culture - Join a team that values delivery excellence and long-term relationships
- Competitive total rewards - Strong compensation, full benefits, 401(k) match, and meaningful work
Equal Employment Opportunity
CARIAN is proud to be an equal opportunity employer. We hire and develop talent based on qualifications, performance, and business needs. Employment decisions are made without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other protected characteristic. As a women-owned firm dedicated to the power sector, we are committed to building a team that reflects professionalism, expertise, and integrity at every level.