2

Full Time Production Planner Scheduler Jobs (NOW HIRING)

This role oversees end-to-end production planning and master scheduling within a fast-paced manufacturing environment. The Master Scheduler develops and maintains production schedules, balances ...

Planner Scheduler

Northfield, MN · On-site

$55K - $76K/yr

Plans, schedules, coordinates, and approves product release to the production planning systems based on material and capacity availability. Here is a glimpse of what you'll do: * Checking the ...

Planner Scheduler

Northfield, MN · On-site

$55K - $76K/yr

Plans, schedules, coordinates, and approves product release to the production planning systems based on material and capacity availability. Here is a glimpse of what you'll do: * Checking the ...

Job Title: Planner-Scheduler Location: Winfield WV Department: Mining Service Center Reports To ... This role ensures accurate demand forecasting, production planning, inventory control, and supply ...

Job Title: Planner-Scheduler Location: Winfield WV Department: Mining Service Center Reports To ... This role ensures accurate demand forecasting, production planning, inventory control, and supply ...

Showing results 41-60

Full Time Production Planner Scheduler information

See salary details

$16

$31

$49

How much do full time production planner scheduler jobs pay per hour?

As of Sep 3, 2026, the average hourly pay for full time production planner scheduler in the United States is $31.75, according to ZipRecruiter salary data. Most workers in this role earn between $24.52 and $37.50 per hour, depending on experience, location, and employer.

What is the difference between Full Time Production Planner Scheduler vs Production Coordinator?

AspectFull Time Production Planner SchedulerProduction Coordinator
Primary RolePlans and schedules production activities to meet deadlinesCoordinates production activities and communicates between teams
Required SkillsScheduling, inventory management, ERP systemsCommunication, coordination, problem-solving
Work EnvironmentManufacturing or production facilities, office settingsManufacturing sites, offices, cross-departmental
CertificationsOften requires supply chain or production planning certificationsLess formal certifications, focus on communication skills

The Full Time Production Planner Scheduler focuses on detailed scheduling and planning to ensure production runs smoothly, while the Production Coordinator manages daily coordination and communication across teams. Both roles are essential in manufacturing environments but differ mainly in scope and responsibilities.

Do full time production planner schedulers make good money?

Full-time production planner schedulers typically earn a median annual salary ranging from $50,000 to $75,000, depending on experience, industry, and location. They often require skills in inventory management, scheduling software, and supply chain coordination, which can influence compensation levels.

How much do full time production planner schedulers make in the US?

Full-time production planner schedulers in the US typically earn between $50,000 and $80,000 annually, depending on experience, industry, and location. Salaries can vary based on the complexity of planning tasks, certifications, and company size.

Is being a full time production planner scheduler hard?

Full-time production planner schedulers manage manufacturing schedules, coordinate resources, and ensure timely delivery, which can involve multitasking and problem-solving. The job requires strong organizational skills, familiarity with planning tools, and attention to detail, but the difficulty varies based on industry complexity and experience level.

What does a full time production planner scheduler do?

A full-time production planner scheduler coordinates manufacturing schedules to ensure timely production and delivery of products. They analyze demand forecasts, manage inventory levels, and use planning tools like ERP systems to optimize workflow and resource allocation, often working closely with production teams and supply chain personnel.

What cities are hiring for Full Time Production Planner Scheduler jobs?

Cities with the most Full Time Production Planner Scheduler job openings:

What are the most commonly searched types of Production Planner Scheduler jobs?

The most popular types of Production Planner Scheduler jobs are:

Manufacturing Production Planner/Scheduler II

PowerSecure

Winston Salem, NC • On-site

Full-time

Re-posted 7 days ago


Job description

Job Summary:

This individual will be responsible for planning, organizing, and maintaining the Shop Floor Schedule. The SFS is a planned production assembly schedule, in weekly capacity-constrained sections, that is derived from the Master Production Schedule. The goals of the Production Scheduler are production efficiency, velocity, and on-time completion of Shop Operations and Shop Orders to Original Customer Promise. The Production Scheduler works together with the Master Scheduler to ensure plant loading that results from the SFS neither under or overloads available capacity. The Production Scheduler also works together with Manufacturing Engineering, Purchasing, and Material Analysts to ensure plant loading from the SFS takes into consideration material availability.

Minimum Qualifications: (Education, Experience, Knowledge, and Skills):

  • Bachelor’s degree preferred
  • 3-5 years of planning experience preferred
  • APICS – CPIM certification is preferred or willing to obtain
  • Individual must be a highly-organized, open-minded & motivated self-starter.
  • A high level of communication skills (verbal & written) is required.
  • A “hands-on” approach to monitoring production processes versus the SFS is required – including frequent interactions with floor-level supervisors, production managers, materials analysts, buyers, and senior management.
  • A proactive problem solving methodology – acting as a catalyst for bringing to right team members together to resolve issues that create risk of shipment to OCP, before results are missed.
  • Ability to report findings and KPI’s to Production Control Manager.

Job Duties and Responsibilities:

  • Develop and maintain the Shop Floor Schedule (SFS), with the goal of achieving 90%+ on-time shipment to OCP.
  • Drive high accuracy into the SFS for a rolling 4-week time period, to ensure plant capacity is effectively utilized to meet aggressive business growth goals.
  • Develop an SFS that specifies the timing and sequence of shop operations and shop orders based on multiple inputs – Master Production Schedule (MPS), material availability, labor capacity, and project priority.
  • Develop and maintain (in IFS) a clear view of plant demand/loading by Work Center (based on current scheduled SO loading and hours in routings).
  • Monitor workflow and plant production areas to ensure on time delivery while reducing downtime, changeovers and hours worked.
  • Setup and maintain a strong communication system with Work Center leads and Manufacturing Engineering to ensure hours in routings accurately reflect the time needed to do the work. Identify areas where estimates and actual hours differ, and coordinate with Manufacturing Engineering to update templates to ensure future accuracy.
  • Develop work process/procedure to utilize current IFS functionality to improve the accuracy and efficiency of scheduling new work and balancing Work Center loading. Load new SO's based on open capacity.
  • Supply work bills and other paperwork required to complete the scheduled work (Kitting)
  • Identify, own, and deliver revisions made to Bill of Material that impact manufacturing.
  • Proactive communication in the event of under or over load situations to enable adjustments in shop operation/order schedules to ensure on-time performance is maintained for business-critical projects.
  • Maintain KPI's for Shop Order and Shop Operation on-time completion to (original) schedule.
  • Additional responsibilities and objectives will be added as needed based on business and area of needs.

Physical Demands and Work Environment:

  • Must be able to work in an office environment with a lot of sitting
  • Must be able to tolerate a full day of computer screen viewing
  • Some walking will be required to browse production on the shop floor
  • Professional office environment
  • General manufacturing environment

The above statements are intended to describe the general nature and level of work being performed by individuals assigned to this position. They are not intended to be an exhaustive list of all responsibilities, duties, and skills required. Management reserves the right to assign or reassign duties and responsibilities at any time, based on business needs.

PowerSecure is an equal opportunity employer where an applicant's qualifications are considered without regard to race, color, religion, sex, national origin, age, disability, veteran status, genetic information, sexual orientation, gender identity or expression, or any other basis prohibited by law.