Production Team Member- Welding
AL · On-site
$16 - $21.25/hr
Ability to calculate figures and amounts such as discounts, interest, commissions, proportions ... x-ray.
AL · On-site
$16 - $21.25/hr
Ability to calculate figures and amounts such as discounts, interest, commissions, proportions ... x-ray.
AL · On-site
$16 - $21.25/hr
Ability to calculate figures and amounts such as discounts, interest, commissions, proportions ... x-ray.
$24.75 - $32.25/hr
At least 3 years of pipe combo welding in industrial construction setting * OSHA 10 preferred, AWS ... This assignment is 100% x-ray inspection of welds Physical/Site Requirements: * Provide OSHA 10 ...
$24.75 - $32.25/hr
At least 3 years of pipe combo welding in industrial construction setting * OSHA 10 preferred, AWS ... This assignment is 100% x-ray inspection of welds Physical/Site Requirements: * Provide OSHA 10 ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Worland, WY · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Worland, WY · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Worland, WY · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Worland, WY · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
Glendive, MT · On-site
$39.73 - $48.56/hr
... with x-ray numbers, welder ID, Unique Material Number, and hydro-test reports. * Ensures pipe is correctly coated and ready to commission. * Ensure pipeline valves are properly installed and ...
... welding, cutting and brazing safety, respiratory protection, hearing conservation, excavation ... X-ray Equipment Registrations. Agencies are Nuclear Regulatory Commission (NRC) and Wisconsin ...
... welding, cutting and brazing safety, respiratory protection, hearing conservation, excavation ... X-ray Equipment Registrations. Agencies are Nuclear Regulatory Commission (NRC) and Wisconsin ...
... welding, cutting and brazing safety, respiratory protection, hearing conservation, excavation ... X-ray Equipment Registrations. Agencies are Nuclear Regulatory Commission (NRC) and Wisconsin ...
... welding, cutting and brazing safety, respiratory protection, hearing conservation, excavation ... X-ray Equipment Registrations. Agencies are Nuclear Regulatory Commission (NRC) and Wisconsin ...
$24.76 - $27.69
5% of jobs
$27.69 - $30.62
3% of jobs
$30.62 - $33.54
11% of jobs
$34.49 is the 25th percentile. Wages below this are outliers.
$33.54 - $36.47
18% of jobs
$36.47 - $39.40
10% of jobs
The median wage is $40.28 / hr.
$39.40 - $42.33
11% of jobs
$42.33 - $45.26
12% of jobs
$46.60 is the 75th percentile. Wages above this are outliers.
$45.26 - $48.19
13% of jobs
$48.19 - $51.11
7% of jobs
$51.11 - $54.04
5% of jobs
$54.04 - $56.97
5% of jobs
$24
$41
$56
Sourced by ZipRecruiter