1

Tank Erection Jobs in Texas (NOW HIRING)

One (1) or more years storage tank erection or inspection experience (Preferred) * Two (2) or more years SAP or equivalent (Matrix, Maximo) planning experience (Required) * Two (2) or more years ...

New

Tank Bullganger

Nederland, TX · On-site

$26.25 - $29.25/hr

Company Overview CB&I ® is the world's leading designer and builder of storage facilities, tanks ... Align, fit and tack steel shapes together utilizing temporary erection gear, fit-up (pry) bars, and ...

Prepares customer, fabrication, and erection drawings of above-ground storage tank products and assemblies using AutoCAD in accordance with company standards, notes, sketches, and instructions.

Traveling Laborer Journeyman

Grand Prairie, TX · On-site

$16.75 - $21.50/hr

Assists with the shoring erection, bracing, dismantling, and load out of shoring materials. * Assists with assembling pipe and fabrication of forms for pipe pits. * Loads out the tank including ...

Traveling Laborer Journeyman

El Paso, TX · On-site

$16 - $20.50/hr

Assists with the shoring erection, bracing, dismantling, and load out of shoring materials. * Assists with assembling pipe and fabrication of forms for pipe pits. * Loads out the tank including ...

The major part of the Civil work on this Project consists of the erection of the cylindrical LNG Tank Concrete Containment Wall & Roof utilizing the proprietary Bechtel BICSS (Bechtel Integrated ...

The major part of the Civil work on this Project consists of the erection of the cylindrical LNG Tank Concrete Containment Wall & Roof utilizing the proprietary Bechtel BICSS (Bechtel Integrated ...

Traveling Laborer Journeyman

El Paso, TX · On-site

$16 - $20.50/hr

Assists with the shoring erection, bracing, dismantling, and load out of shoring materials. * Assists with assembling pipe and fabrication of forms for pipe pits. * Loads out the tank including ...

Traveling Laborer Journeyman

El Paso, TX

$16 - $20.50/hr

Assists with the shoring erection, bracing, dismantling, and load out of shoring materials. * Assists with assembling pipe and fabrication of forms for pipe pits. * Loads out the tank including ...

Traveling Laborer Journeyman

El Paso, TX

$16 - $20.50/hr

Assists with the shoring erection, bracing, dismantling, and load out of shoring materials. * Assists with assembling pipe and fabrication of forms for pipe pits. * Loads out the tank including ...

next page

Showing results 1-20

Tank Erection information

What is tank erection?

Tank erection is the process of assembling and installing large storage tanks, typically used in industries like oil and gas, water treatment, or chemicals. This job involves preparing the site, constructing the tank structure—often made of steel plates—welding, and ensuring the tank is safe and leak-proof. Tank erectors must follow strict safety standards and engineering specifications throughout the process. The work can be physically demanding and often requires operating cranes and other heavy equipment. Skilled professionals are essential to ensure the tanks are durable and meet industry regulations.

What are the key skills and qualifications needed to thrive as a tank erection technician?

To excel as a Tank Erection Technician, you need a solid understanding of mechanical assembly, blueprint reading, welding, and safety protocols, usually supported by a vocational qualification or relevant experience. Familiarity with tools such as welding machines, cranes, rigging systems, and personal protective equipment (PPE) is essential, and certifications like OSHA safety training or specific welding credentials are often required. Attention to detail, teamwork, and problem-solving abilities are vital soft skills for ensuring precision and effective collaboration on job sites. These skills and qualifications are crucial for building safe, reliable tank structures and maintaining high safety and quality standards in industrial environments.

What are some common challenges faced during tank erection projects and how are they typically managed?

Tank erection professionals often face challenges such as working in varying weather conditions, maintaining strict safety standards, and coordinating with multiple teams including welders, crane operators, and inspectors. Managing tight project timelines while ensuring compliance with engineering specifications and quality standards is also critical. These challenges are typically managed through thorough planning, regular safety meetings, clear communication, and adhering to industry best practices for lifting, welding, and assembly. Most teams operate under a structured hierarchy led by a site supervisor to ensure smooth workflow and problem resolution.

What is the difference between Tank Erection vs Tank Fabrication?

AspectTank ErectionTank Fabrication
Primary FocusAssembling and installing tanks on-siteManufacturing and constructing tanks in a workshop
Work EnvironmentConstruction sites, outdoor and industrial settingsFactories, workshops, manufacturing plants
Required CertificationsWelding, safety, and rigging certificationsWelding, fabrication, and safety certifications
Industry UsageConstruction, oil & gas, chemical industriesManufacturing, metalworking, industrial production

While both roles involve working with tanks, Tank Erection focuses on assembling and installing tanks on-site, requiring rigging and safety skills. Tank Fabrication involves manufacturing tanks in a workshop, emphasizing welding and metalworking skills. Understanding these differences helps clients find the right expertise for their project needs.

What are popular job titles related to Tank Erection jobs in Texas?

For Tank Erection jobs in Texas, the most frequently searched job titles are:

What job categories do people searching Tank Erection jobs in Texas look for?

The top searched job categories for Tank Erection jobs in Texas are:

What cities in Texas are hiring for Tank Erection jobs?

Cities in Texas with the most Tank Erection job openings:

Infographic showing various Tank Erection job openings in Texas as of August 2026, with employment types broken down into 1% As Needed, 81% Full Time, 14% Part Time, 3% Contract, and 1% Nights. Highlights an 99% Physical, and 1% Remote job distribution.

Tank Erector/Constructor Bullganger

Bechtel Construction Services

Brownsville, TX • On-site

Full-time

Posted 11 days ago


Job description


1. Understands the safe work processes in place. Demonstrates a safety culture of always performing work safely, setting an example and coaching other less experienced bullgangers.
2. Possesses an understanding of the sequence of activities performed during the tank erection process and performs these without being directed.
3. Understands the potential outcomes of the misuse of primary tank building tools and equipment and demonstrates knowledge of their safe, efficient use.
4. Understands proper use of plate clamps, has knowledge of proper applications for wire rope and/or synthetic slings.
5. Recognizes hazards and takes the necessary action to mitigate those hazards.
6. Perform heavy construction work focused on the erection of steel plate tanks and vessels.
7. Learn and use training provided to maintain personal and team safe behaviors and procedures.
8. Maintain good housekeeping.
9. Perform general labor, removal of temporary erection material, scaffold material handling, material handling, air hose and weld lead maintenance within a team of Tank Builders.
10. With training, safely work around and operate air and electric powered hand tools, grinding and power brushing of weld seams and final cleaning of tank material.
11. Erection of tank external structural steel, platforms, and associated components.
12. Fabricate and install internal tank piping, instruments, and all associated components.
13. Ability to operate construction equipment as required; including lifting, material handling and personnel access equipment.
14. Work safely around welding and burning activities.
15. Assist in basic rigging and tagging.
16. Recognize and remove defective tools and equipment from service.
17. Recognize hazards and take action to mitigate and remove.
18. Typically requires at least 6 months industrial tank construction.